Bridgepower Corp.

Address(es)
  • (GOSAEK-DONG) 16 OMOKCHEN-RO 132BEON-GIL GWONSEON-GU SUWON-SI GYEONGGI 441-813
    Korea, Republic of

Website Not available
Status

WITHDRAWN

Acceptance date 2017-11-03

Further information

Stage

Country

Name

2

Denmark

2

Denmark

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

MED

4.11 Power Input5.7 Humidity Conditioning5.9.2 Determination of Accessible Parts7.1.2 Legibility of Markings7.1.3 Durability of Markings78.4.3 Voltage or Charge Limitation8.6.4 a Impedance and Current Carrying Capability8.7 Leakage Current Tests8.7.4.5 Earth Leakage Current8.7.4.6 Touch Leakage Current8.8.3 Dielectric Voltage Withstand8.8.4.1 Ball Pressure8.11.3.5 Cord Anchorage11 Temperature11.6.6 Cleaning and Disinfection11.8 Interruption of the Power Supply13 Abnormal Operation Testing13.1.2 Power Availability13.2 Impairment of Cooling15.3.2 Enclosure Force15.3.3 Enclosure Impact15.3.4 Drop Impact15.3.5 Rough Handling15.3.6 Mold Stress Relief
2019-08-01

MED

4.11 Power Input5.7 Humidity Conditioning5.9.2 Determination of Accessible Parts7.1.2 Legibility of Markings7.1.3 Durability of Markings78.4.3 Voltage or Charge Limitation8.6.4 a Impedance and Current Carrying Capability8.7 Leakage Current Tests8.7.4.5 Earth Leakage Current8.7.4.6 Touch Leakage Current8.8.3 Dielectric Voltage Withstand8.8.4.1 Ball Pressure8.11.3.5 Cord Anchorage11 Temperature11.6.6 Cleaning and Disinfection11.8 Interruption of the Power Supply13 Abnormal Operation Testing13.1.2 Power Availability13.2 Impairment of Cooling15.3.2 Enclosure Force15.3.3 Enclosure Impact15.3.4 Drop Impact15.3.5 Rough Handling15.3.6 Mold Stress Relief
2019-08-01

MED

4.11 Power Input5.7 Humidity Conditioning5.9.2 Determination of Accessible Parts7.1.2 Legibility of Markings7.1.3 Durability of Markings78.4.3 Voltage or Charge Limitation8.6.4 a Impedance and Current Carrying Capability8.7 Leakage Current Tests8.7.4.5 Earth Leakage Current8.7.4.6 Touch Leakage Current8.8.3 Dielectric Voltage Withstand8.8.4.1 Ball Pressure8.11.3.5 Cord Anchorage11 Temperature11.6.6 Cleaning and Disinfection11.8 Interruption of the Power Supply13 Abnormal Operation Testing13.1.2 Power Availability13.2 Impairment of Cooling15.3.2 Enclosure Force15.3.3 Enclosure Impact15.3.4 Drop Impact15.3.5 Rough Handling15.3.6 Mold Stress Relief
2022-06-23