Advantest America, Inc.
Advantest America, Inc.
Address(es) |
|
Website | Not available |
Status | WITHDRAWN |
Acceptance date | 2020-04-13 |
Further information
Stage | Country | Name |
---|---|---|
1 | Germany |
LEGEND: Scope Limitations
- RA : Audio amplifiers with audio power > 0,5 Watts excluded
- RC : Apparatus with connection(s) to a cable distribution system excluded
- RSH : Shredders excluded
- RT : Apparatus with connection(s) to a telecommunication network excluded
- RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
- ROUT : Equipment intended for installation outdoors excluded
- RWPT : Wireless power transmitter excluded
Category | Name | Tests/Clauses | Acceptance Date | Responsible National Certification Body |
---|---|---|---|---|
MEAS | IEC 61010-1:2010 | Accepted clauses:4.4 - Single Fault Condition5.1.3 – Mains Supply5.3 – Durability of Markings6 – Protection Against Electric Shock6.2 – Determination of Accessible Parts6.3.1 – Values in Normal Conditions6.3.2 – Values in Single Fault Conditions6.5.1 – Protective Bonding/Bonding Impedance6.7 – Clearance and Creepage Distances6.8 – Dielectric Strength7.4 - Stability8 – Mechanical Resistance to Shock and Impact8.2 – Enclosure Rigidity10 – Equipment Temperature Limits12.5 - Sound Level14.3 – Overtemperature protection devicesExcluding Clause 6.8.2 Humidity Preconditioning(To be performed at CBTL facility) | 2020-04-13 | |
MEAS | IEC 61010-1:2010/AMD1:2016 | Accepted clauses:4.4 - Single Fault Condition5.1.3 – Mains Supply5.3 – Durability of Markings6 – Protection Against Electric Shock6.2 – Determination of Accessible Parts6.3.1 – Values in Normal Conditions6.3.2 – Values in Single Fault Conditions6.5.1 – Protective Bonding/Bonding Impedance6.7 – Clearance and Creepage Distances6.8 – Dielectric Strength7.4 - Stability8 – Mechanical Resistance to Shock and Impact8.2 – Enclosure Rigidity10 – Equipment Temperature Limits12.5 - Sound Level14.3 – Overtemperature protection devicesExcluding Clause 6.8.2 Humidity Preconditioning(To be performed at CBTL facility) | 2022-09-26 |