ABB S.p.A. (LABORATORIO PROVE) [Prod. Cat.: EMC] [308]

Address(es)
  • Viale dell'Industria, 18
    IT-20010 Vittuone
    Milano (MI)
    Italy

Website Not available
Status

MEMBER

Acceptance date 2017-06-09

Further information

Stage

Country

Name

2

Italy

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

EMC

Accepted sub-clause 8.2 (Conducted Emissions)
2017-10-27

EMC

Accepted sub-clause 8.2 (Conducted Emissions)
2017-10-27

EMC

Accepted sub-clause 8.2 (Conducted Emissions)
2021-03-23

EMC

All clauses
2023-06-06

EMC

All clauses except 5.3.2, 5.3.3, 5.4.2
2017-10-27

EMC

All clauses
2021-03-23

EMC

Accepted Annex A.3 (Conducted Emissions)
2021-03-23

EMC

Accepted Annex A.3 (Conducted Emissions)
2021-03-23

EMC

All clauses
2017-10-27

EMC

All clauses
2017-10-27

EMC

All clauses
2017-10-27

EMC

All clauses
2021-03-23

EMC

All clauses
2017-10-27

EMC

Accepted clauses of only continuous field up to 30 A/m
2019-07-16

EMC

All clauses (single-phase systems only)
2021-03-23

EMC

All clauses except 1.1 Table 1 (Magnetic Field)
2021-03-23

EMC

All clauses except 1.1 Table 1 (Magnetic Field)
2021-03-23

EMC

All clauses except tests belonging to IEC 61000-3 series
2017-10-27

EMC

All clauses except tests belonging to IEC 61000-3 series
2017-10-27

EMC

All clauses
2021-03-23

EMC

All clauses except Radiated emission measurement and Electromagnetic field
2023-06-06

EMC

All clauses except radiated emission measurement and Electromagnetic field
2019-07-16

EMC

All clauses except Ref. T 2.5 of Tab. 2 and radiated emission measurements
2017-10-27

EMC

All clauses except Ref. T 2.5 of Tab. 2 and radiated emission measurements
2017-10-27

EMC

All clauses except Ref. T 2.5 of Tab. 2 and radiated emission measurements
2017-06-09

INST

Accepted clause 26 (except 26.1.5, 26.1.7)
2023-06-06

INST

Accepted clause 26 (except 26.1.5, 26.1.7)
2017-10-27

INST

Accepted clause 26 (except 26.1.5, 26.1.7)
2017-10-27

INST

Accepted clause 26 (except 26.1.5, 26.1.7)
2017-10-27

INST

Accepted clause 26 (except 26.2.6, 26.2.8, 26.3.1, 26.3.4)
2017-10-27

POW

Accepted sub-clause 8.4.1 (except 8.4.1.2.3, 8.4.1.2.7)
2017-10-27

POW

Accepted sub-clause 8.4.1 (except 8.4.1.2.3, 8.4.1.2.7)
2017-10-27

POW

Accepted sub-clause 8.4.1 (except 8.4.1.2.3, 8.4.1.2.7)
2017-10-27

POW

Accepted Annex J (except J.2.3, J.3.3)
2017-10-27

PROT

Accepted Annex H (except radiated emissions), Annex I (except Table 5 - T 2.5), Annex J
2017-10-27

PROT

Accepted Annex H (except radiated emissions), Annex I (except Table 5 - T 2.5), Annex J
2017-10-27

PROT

Accepted Annex H (except radiated emissions), Annex I (except Table 5 - T 2.5), Annex J
2017-10-27

PROT

Accepted Annex H (except radiated emissions), Annex I (except Table 5 - T 2.5), Annex J
2017-10-27

PROT

Accepted Annex H (except radiated emissions), Annex I (except Table 5 - T 2.5), Annex J
2017-10-27

PROT

Accepted Annex H (except radiated emissions), Annex I (except Table 5 - T 2.5), Annex J
2017-10-27

PROT

Accepted Annex H (except radiated emissions), Annex I (except Table 5 - T 2.5), Annex J
2017-10-27

PROT

Accepted Annex H (except radiated emissions), Annex I (except Table 5 - T 2.5), Annex J
2017-10-27

PROT

Accepted Annex H (except radiated emissions), Annex I (except Table 5 - T 2.5), Annex J
2017-10-27

PROT

Accepted Annex H (except radiated emissions), Annex I (except Table 5 - T 2.5), Annex J
2017-10-27

PROT

Accepted Annex H (except radiated emissions), Annex I (except Table 5 - T 2.5), Annex J
2017-10-27

PROT

Accepted clause 22 (except Radiated Emission measurement and Electromagnetic field)
2023-06-06