CTF

Cisco Systems Inc.

 
  •  

Standards in Scope

Category
Standard
Tests/Clauses
Acceptance Date
Responsible National Certification Body(s)
OFFIEC 60950-1:2005
4.2.7, 4.2.1 STRESS RELIEF TEST 4.3.5 CONNECTOR CURRENT INTERRUPTION 4.5.1, 1.4.12, 1.4.13 HEATING TEST 5.1, ANNEX D TOUCH CURRENT TEST: SINGLE-PHASE/POLYPHASE: TN/TT SYSTEM 5.2.2 ELECTRIC STRENGTH 5.3.1 - 5.3.9 ABNORMAL OPERATION TESTS 5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR ANNEX B.7 LOCKED-ROTOR OVERLOAD FOR DC MOTORS IN SECONDARY CIRCUITS
2018-10-02
OFFIEC 60950-1:2005/AMD1:2009
1.6.2 INPUT TEST: POLYPHASE "1.6.2 " INPUT: SINGLE-PHASE 2.1.1.7 " CAPACITANCE DISCHARGE TEST" 2.5 " LIMITED POWER SOURCE MEASUREMENTS" 2.6.3.4, 2.6.1 " PROTECTIVE BONDING TEST I" 2.6.3.4, 2.6.1 " PROTECTIVE BONDING TEST II" 3.1.9 CONDUCTOR TERMINATIONS - STEADY FORCE TEST 4.2.5, 4.2.1 IMPACT 4.3.2 KNOB PULL/HANDLE LOADING 4.4.2, 4.4.4 HAZARDOUS MOVING PARTS 4.5.1, 1.4.12, 1.4.13 " HEATING TEST" 5.1, ANNEX D TOUCH CURRENT (POLYPHASE; TN/TT SYSTEM) "5.1, ANNEX D " TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM) 5.2.2 " ELECTRIC STRENGTH TEST" 5.3.1 - 5.3.9 " ABNORMAL OPERATION TESTS" 5.3.7 " OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR" ANNEX B.7 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS
2018-10-02
OFFIEC 60950-1:2005/AMD2:2013
1.6.2 INPUT TEST: POLYPHASE "1.6.2 " INPUT: SINGLE-PHASE 2.1.1.7 " CAPACITANCE DISCHARGE TEST" 2.5 " LIMITED POWER SOURCE MEASUREMENTS" 2.6.3.4, 2.6.1 " PROTECTIVE BONDING TEST I" 2.6.3.4, 2.6.1 " PROTECTIVE BONDING TEST II" 3.1.9 CONDUCTOR TERMINATIONS - STEADY FORCE TEST 4.2.5, 4.2.1 IMPACT 4.3.2 KNOB PULL/HANDLE LOADING 4.4.2, 4.4.4 HAZARDOUS MOVING PARTS 4.5.1, 1.4.12, 1.4.13 " HEATING TEST" 5.1, ANNEX D TOUCH CURRENT (POLYPHASE; TN/TT SYSTEM) "5.1, ANNEX D " TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM) 5.2.2 " ELECTRIC STRENGTH TEST" 5.3.1 - 5.3.9 " ABNORMAL OPERATION TESTS" 5.3.7 " OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR" ANNEX B.7 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS
2018-10-02