CTF

CHICONY POWER TECHNOLOGY CO LTD

 
  •  

Standards in Scope

Category
Standard
Tests/Clauses
Acceptance Date
Responsible National Certification Body(s)
ITAVIEC 62368-1:2018
4.7 Equipment for Direct Insertion into Mains Socket-Outlets: Moment Test 4.4.4.2, T.5 Steady Force Test, 250N 4.4.4.4, T.6 Impact Test 4.4.4.4, T.7 Drop Test 4.4.4.4, T.8 Stress Relief Test 4.4.4.5, T.3 Steady Force Test, 30N 4.4.4.5, T.4 Steady Force Test, 100N 5.2.2.2 Steady-State Voltage and Current 5.4.1.4, 6.3.2, 9 Temperature Tests 5.4.1.8 Determination of Working Voltage 5.4.1.10.3 Ball Pressure Test 5.4.4.6.2 Separable Thin Sheet Material 5.4.4.6.4, 5.4.4.6.5 Non-separable Thin Sheet Material 5.4.2, 5.4.3 Clearance and Creepage Distance Measurement 5.4.2.6, T.2 Steady Force Test, 10N 5.4.8 Humidity Conditioning 5.4.9.1 Electric Strength 5.5.2.2 Stored Discharge on Capacitors 5.6.6.2 Resistance of The Protective Bonding System 5.7 Prospective Touch Voltage And Touch Current Measurement 5.7.5 Protective Conductor Current 6.2.2 Power Measurements 6.2.3.2 Resistive PIS Determination B.2.5 Input Current B.3, B.4 Abnormal Operating and Fault Conditions F.3.10 Test for the permanence of markings G.5.3.3 Transformer Overloaded Test G.7.3.2 Strain Relief Test Q.1 Limited Power Source
2020-04-16
ITAVIEC 62368-1:2014
4.7 Equipment for Direct Insertion into Mains Socket-Outlets: Moment Test 4.4.4.2, T.5 Steady Force Test, 250N 4.4.4.4, T.6 Impact Test 4.4.4.4, T.7 Drop Test 4.4.4.4, T.8 Stress Relief Test 4.4.4.5, T.3 Steady Force Test, 30N 4.4.4.5, T.4 Steady Force Test, 100N 5.2.2.2 Steady-State Voltage and Current 5.4.1.4, 6.3.2, 9 Temperature Tests 5.4.1.8 Determination of Working Voltage 5.4.1.10.3 Ball Pressure Test 5.4.4.6.2 Separable Thin Sheet Material 5.4.4.6.4, 5.4.4.6.5 Non-separable Thin Sheet Material 5.4.2, 5.4.3 Clearance and Creepage Distance Measurement 5.4.2.6, T.2 Steady Force Test, 10N 5.4.8 Humidity Conditioning 5.4.9.1 Electric Strength 5.5.2.2 Stored Discharge on Capacitors 5.6.6.2 Resistance of The Protective Bonding System 5.7 Prospective Touch Voltage And Touch Current Measurement 5.7.5 Protective Conductor Current 6.2.2 Power Measurements 6.2.3.2 Resistive PIS Determination B.2.5 Input Current B.3, B.4 Abnormal Operating and Fault Conditions F.3.10 Test for the permanence of markings G.5.3.3 Transformer Overloaded Test G.7.3.2 Strain Relief Test Q.1 Limited Power Source
2019-03-20
OFFIEC 60950-1:2005
1.2.2.1 Maximum Output Voltage, Current, And Volt Ampere Measurement Test 1.6.2 Input: Single-Phase 1.7.11 Durability Of Marking Test 2.1.1.5, 2.1.2, 1.2.8.10 Energy hazard measurements 2.1.1.7 Capacitance Discharge Test 2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV Reliability Test Including Hazardous Voltage Measurements 2.4.1, 2.4.2 Limited Current Circuit Measurements 2.5 Limited Power Source Measurements 2.6.3.4, 2.6.1 Protective Bonding Test I 2.6.3.4, 2.6.1 Protective Bonding Test II 2.9.1, 2.9.2, 5.2.2 Humidity Test 2.10.2 Determination of Working Voltage; Voltage Measurement Test 2.10.5.9, 2.10.5.10, 2.10.5.6 Thin Sheet Material Tests 2.10.5.6, 2.10.5.13 Transformer and Wire Insulation Electric Strength Test 3.2.6, 4.2.1, 4.2.7 Strain Relief Test 4.2.1-4.2.4 Steady Force Tests (Enclosure Push Test) 4.2.5, 4.2.1, Part 22 10.2 Impact Test 4.2.6, 4.2.1 Drop Test 4.2.7, 4.2.1 Stress Relief Test 4.3.5 Connector Current Interruption Test 4.3.6 Direct Plug In Equipment-Moment Test 4.5.1, 4.5.2, 1.4.12, 1.4.13 Heating Test 4.5.5, 4.5 Ball Pressure Test 5.1, ANNEX D Touch Current Test (Single-Phase; TN/TT System) 5.2.2 Electric Strength Test 5.3.1, 5.3.4, 5.3.7 Component Failure Test 5.3.1 - 5.3.9 Abnormal Operation Tests 5.3.3, 5.3.7b, Annex C.1 Transformer Abnormal Operation Test 5.3.7 Power Supply Output Short-Circuit/Overload Test 5.3.7 Overload of Operator Accessible Connector Test
2019-03-20
OFFIEC 60950-1:2005/AMD1:2009
1.2.2.1 Maximum Output Voltage, Current, And Volt Ampere Measurement Test 1.6.2 Input: Single-Phase 1.7.11 Durability Of Marking Test 2.1.1.5, 2.1.2, 1.2.8.10 Energy hazard measurements 2.1.1.7 Capacitance Discharge Test 2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV Reliability Test Including Hazardous Voltage Measurements 2.4.1, 2.4.2 Limited Current Circuit Measurements 2.5 Limited Power Source Measurements 2.6.3.4, 2.6.1 Protective Bonding Test I 2.6.3.4, 2.6.1 Protective Bonding Test II 2.9.1, 2.9.2, 5.2.2 Humidity Test 2.10.2 Determination of Working Voltage; Voltage Measurement Test 2.10.5.9, 2.10.5.10, 2.10.5.6 Thin Sheet Material Tests 2.10.5.6, 2.10.5.13 Transformer and Wire Insulation Electric Strength Test 3.2.6, 4.2.1, 4.2.7 Strain Relief Test 4.2.1-4.2.4 Steady Force Tests (Enclosure Push Test) 4.2.5, 4.2.1, Part 22 10.2 Impact Test 4.2.6, 4.2.1 Drop Test 4.2.7, 4.2.1 Stress Relief Test 4.3.5 Connector Current Interruption Test 4.3.6 Direct Plug In Equipment-Moment Test 4.5.1, 4.5.2, 1.4.12, 1.4.13 Heating Test 4.5.5, 4.5 Ball Pressure Test 5.1, ANNEX D Touch Current Test (Single-Phase; TN/TT System) 5.2.2 Electric Strength Test 5.3.1, 5.3.4, 5.3.7 Component Failure Test 5.3.1 - 5.3.9 Abnormal Operation Tests 5.3.3, 5.3.7b, Annex C.1 Transformer Abnormal Operation Test 5.3.7 Power Supply Output Short-Circuit/Overload Test 5.3.7 Overload of Operator Accessible Connector Test
2019-03-20
OFFIEC 60950-1:2005/AMD2:2013
1.2.2.1 Maximum Output Voltage, Current, And Volt Ampere Measurement Test 1.6.2 Input: Single-Phase 1.7.11 Durability Of Marking Test 2.1.1.5, 2.1.2, 1.2.8.10 Energy hazard measurements 2.1.1.7 Capacitance Discharge Test 2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV Reliability Test Including Hazardous Voltage Measurements 2.4.1, 2.4.2 Limited Current Circuit Measurements 2.5 Limited Power Source Measurements 2.6.3.4, 2.6.1 Protective Bonding Test I 2.6.3.4, 2.6.1 Protective Bonding Test II 2.9.1, 2.9.2, 5.2.2 Humidity Test 2.10.2 Determination of Working Voltage; Voltage Measurement Test 2.10.5.9, 2.10.5.10, 2.10.5.6 Thin Sheet Material Tests 2.10.5.6, 2.10.5.13 Transformer and Wire Insulation Electric Strength Test 3.2.6, 4.2.1, 4.2.7 Strain Relief Test 4.2.1-4.2.4 Steady Force Tests (Enclosure Push Test) 4.2.5, 4.2.1, Part 22 10.2 Impact Test 4.2.6, 4.2.1 Drop Test 4.2.7, 4.2.1 Stress Relief Test 4.3.5 Connector Current Interruption Test 4.3.6 Direct Plug In Equipment-Moment Test 4.5.1, 4.5.2, 1.4.12, 1.4.13 Heating Test 4.5.5, 4.5 Ball Pressure Test 5.1, ANNEX D Touch Current Test (Single-Phase; TN/TT System) 5.2.2 Electric Strength Test 5.3.1, 5.3.4, 5.3.7 Component Failure Test 5.3.1 - 5.3.9 Abnormal Operation Tests 5.3.3, 5.3.7b, Annex C.1 Transformer Abnormal Operation Test 5.3.7 Power Supply Output Short-Circuit/Overload Test 5.3.7 Overload of Operator Accessible Connector Test
2019-03-20