CTF

Acbel Polytech Inc.

 
  •  

Standards in Scope

Category
Standard
Tests/Clauses
Acceptance Date
Responsible National Certification Body(s)
ITAVIEC 62368-1:2014
4.7 EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKETOUTLETS: MOMENT TEST 4.7 EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKETOUTLETS: BLADE SECUREMENT TEST 4.7 EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKETOUTLETS: SECURITY OF INPUT CONTACTS 4.7 EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKETOUTLETS: RESISTANCE TO CRUSHING 4.7 EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKETOUTLETS: ROD PRESSURE TEST 5.2, 5.7 CLASSIFICATION OF ELECTRICAL ENERGY SOURCES 5.2.1.1 ACCESSIBLE ES1 CIRCUITS SEPARATED FROM OTHER ES CIRCUITS USING COMPONENTS 5.4.1.4, Annex B.2 MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS 5.4.1.8 DETERMINATION OF WORKING VOLTAGE 5.4.1.10.3 BALL PRESSURE TEST 5.4.2.4 MINIMUM CLEARANCE BASED UPON ELECTRIC STRENGTH TEST 5.4.4.6.2 SEPARABLE THIN SHEET MATERIAL 5.4.8 HUMIDITY CONDITIONING 5.4.9 ELECTRIC STRENGTH TEST 5.5.2.2 SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR 5.6.6.2(a), 5.6.6.2(b), 5.6.6.4.2(c), 5.6.6.4.2(d), 5.6.6.2(e) RESISTANCE OF THE PROTECTIVE BONDING SYSTEM 5.7 PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT 5.7.5 PROTECTIVE CONDUCTOR CURRENT 6.2.2.2, 6.2.2.3 POWER MEASUREMENTS 6.2.3.1 ARCING PIS DETERMINATION 6.2.3.2 RESISTIVE PIS DETERMINATION 6.3 NORMAL OPERATING CONDITIONS TEMPERATURE TEST 6.4.3, ANNEX B.4 REDUCTION OF THE LIKELIHOOD OF IGNITION UNDER SINGLE FAULT CONDITIONS 6.4.3.3 REDUCTION OF THE LIKELIHOOD OF IGNITION ‐ TEMPERATURES LIMITED BY FUSES 6.6 TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION 8.5.3, ANNEX T.8, ANNEX V ACCESSIBILITY TO MOVING PARTS 8.8 HANDLE STRENGTH ANNEX B.2.5 INPUT TEST: SINGLE PHASE ANNEX B.2.5 INPUT TEST: POLYPHASE ANNEX B.2.6 NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENT ANNEX B.3 SIMULATED ABNORMAL OPERATING CONDITIONS ANNEX B.4 SIMULATED SINGLE FAULT CONDITIONS 6.4.2, ANNEX B.4 SINGLE FAULT CONDITIONS: REDUCE THE LIKELIHOOD OF IGNITION ANNEX F.3.10 TEST FOR THE PERMANENCE OF MARKINGS ANNEX G.5.3.3 TRANSFORMER OVERLOAD ANNEX G.5.3.3.3 TRANSFORMER OVERLOAD – ALTERNATIVE TEST METHOD ANNEX G.5.4.6.3 ALTERNATIVE LOCKED‐ROTOR OVERLOAD TEST FOR D.C. MOTORS ANNEX G.7.3.2 STRAIN RELIEF TEST ANNEX G.8.3.2 VARISTOR OVERLOAD TEST ANNEX K.7.2 K.7.3 RELAY OVERLOAD TEST ANNEX M.3.2 PROTECTION CIRCUITS FOR BATTERIES ANNEX P.2.3.2 CONSEQUENCE OF ENTRY TEST ANNEX Q.1 LIMITED POWER SOURCE ANNEX T.2 (5.4.2.6, 5.4.3.2, G.15.3.6) STEADY FORCE TEST, 10 N ANNEX T.3 (4.4.4.2, 4.4.4.5, 5.3.2.3, G.15.3.6, U.3) STEADY FORCE TEST, 30 N ANNEX T.4 (4.4.4.2) STEADY FORCE TEST, 100 N ANNEX T.4 (4.4.4.2) STEADY FORCE TEST, 250 N ANNEX T.6 (4.4.4.4, 8.10.4) ENCLOSURE IMPACT TEST ANNEX T.7 (4.4.4.3) DROP TEST ANNEX T.8 (4.4.4.1, 4.4.4.7, 4.8.4.2, 8.6.1, 8.7.2, 8.10.6, G.7.3.2.4) STRESS RELIEF TEST
2019-03-05
OFFIEC 60950-1:2005
1.2.2.1 MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT-AMPERE MEASUREMENT TEST. 1.6.2 INPUT TEST: SINGLE - PHASE 1.7.11 DURABILITY OF MARKING TEST 2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS 2.1.1.7 CAPACITANCE DISCHARGE TEST 2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV RELIABILITY TEST 2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS 2.5 LIMITED POWER SOURCE MEASUREMENTS 2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I 2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST II 2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST 2.10.2 DETERMINATION OF WORKING VOLTAGE 2.10.5.9, 2.10.5.10, 2.10.5.6 THIN SHEET MATERIAL TESTS 2.10.5.13 TRANSFORMER AND WIRE/INSULATION ELECTRIC STRENGTH 3.2.6 STRAIN RELIEF TEST 4.1 STABILITY TESTS 4.2.1-4.2.4 STEADY FORCE TESTS 4.2.5, 4.2.1, PART 22.10.2 IMPACT TEST 4.2.6, 4.2.1 DROP TEST 4.2.7, 4.2.1 Stress Relief Test 4.3.6 DIRECT PLUG IN EQUIPMENT-MOMENT TEST 4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST 4.5.1, 1.4.12, 1.4.13 HEATING TEST 4.5.5, 4.5 BALL PRESSURE TEST 5.1, ANNEX D TOUCH CURRENT TEST(SINGLE – PHASE; TN/TT SYSTEM) 5.2.2 ELECTRIC STRENGTH TEST 5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST 5.3.1 ABNORMAL OPERATON TESTS 5.3.3, 5.3.7B, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION TEST 5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TEST
2019-03-05
OFFIEC 60950-1:2005/AMD1:2009
1.2.2.1 MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT-AMPERE MEASUREMENT TEST. 1.6.2 INPUT TEST: SINGLE - PHASE 1.7.11 DURABILITY OF MARKING TEST 2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS 2.1.1.7 CAPACITANCE DISCHARGE TEST 2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV RELIABILITY TEST 2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS 2.5 LIMITED POWER SOURCE MEASUREMENTS 2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I 2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST II 2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST 2.10.2 DETERMINATION OF WORKING VOLTAGE 2.10.5.9, 2.10.5.10, 2.10.5.6 THIN SHEET MATERIAL TESTS 2.10.5.13 TRANSFORMER AND WIRE/INSULATION ELECTRIC STRENGTH 3.2.6 STRAIN RELIEF TEST 4.1 STABILITY TESTS 4.2.1-4.2.4 STEADY FORCE TESTS 4.2.5, 4.2.1, PART 22.10.2 IMPACT TEST 4.2.6, 4.2.1 DROP TEST 4.2.7, 4.2.1 Stress Relief Test 4.3.6 DIRECT PLUG IN EQUIPMENT-MOMENT TEST 4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST 4.5.1, 1.4.12, 1.4.13 HEATING TEST 4.5.5, 4.5 BALL PRESSURE TEST 5.1, ANNEX D TOUCH CURRENT TEST(SINGLE – PHASE; TN/TT SYSTEM) 5.2.2 ELECTRIC STRENGTH TEST 5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST 5.3.1 ABNORMAL OPERATON TESTS 5.3.3, 5.3.7B, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION TEST 5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TEST
2019-03-05
OFFIEC 60950-1:2005/AMD2:2013
1.2.2.1 MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT-AMPERE MEASUREMENT TEST. 1.6.2 INPUT TEST: SINGLE - PHASE 1.7.11 DURABILITY OF MARKING TEST 2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS 2.1.1.7 CAPACITANCE DISCHARGE TEST 2.2.2, 2.2.3, 2.2.4, PART 22 6.1 SELV RELIABILITY TEST 2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS 2.5 LIMITED POWER SOURCE MEASUREMENTS 2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I 2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST II 2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST 2.10.2 DETERMINATION OF WORKING VOLTAGE 2.10.5.9, 2.10.5.10, 2.10.5.6 THIN SHEET MATERIAL TESTS 2.10.5.13 TRANSFORMER AND WIRE/INSULATION ELECTRIC STRENGTH 3.2.6 STRAIN RELIEF TEST 4.1 STABILITY TESTS 4.2.1-4.2.4 STEADY FORCE TESTS 4.2.5, 4.2.1, PART 22.10.2 IMPACT TEST 4.2.6, 4.2.1 DROP TEST 4.2.7, 4.2.1 Stress Relief Test 4.3.6 DIRECT PLUG IN EQUIPMENT-MOMENT TEST 4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST 4.5.1, 1.4.12, 1.4.13 HEATING TEST 4.5.5, 4.5 BALL PRESSURE TEST 5.1, ANNEX D TOUCH CURRENT TEST(SINGLE – PHASE; TN/TT SYSTEM) 5.2.2 ELECTRIC STRENGTH TEST 5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST 5.3.1 ABNORMAL OPERATON TESTS 5.3.3, 5.3.7B, ANNEX C.1 TRANSFORMER ABNORMAL OPERATION TEST 5.3.7 POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TEST
2019-03-05
TRONIEC 60065:2014N/A