CTF

Microsoft Corp

 
  •  

Standards in Scope

Category
Standard
Tests/Clauses
Acceptance Date
Responsible National Certification Body(s)
ITAVIEC 62368-1:2014
4.8.4.2, ANNEX T.8 PRODUCTS CONTAINING LITHIUM COIN/BUTTON CELL BATTERIES: STRESS RELIEF TEST 4.8.4.3 PRODUCTS CONTAINING LITHIUM COIN/BUTTON CELL BATTERIES: BATTERY REPLACEMENT TEST 4.8.4.4 PRODUCTS CONTAINING LITHIUM COIN/BUTTON CELL BATTERIES: DROP TEST 4.8.4.5 PRODUCTS CONTAINING LITHIUM COIN/BUTTON CELL BATTERIES: IMPACT TEST 4.8.4.6 PRODUCTS CONTAINING LITHIUM COIN/BUTTON CELL BATTERIES: CRUSH TEST 5.2, 5.7 CLASSIFICATION OF ELECTRICAL ENERGY SOURCES 5.4.1.4, ANNEX B.2 MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS 5.4.1.8 DETERMINATION OF WORKING VOLTAGE 5.4.10 SAFEGUARDS AGAINST TRANSIENT VOLTAGES FROM EXTERNAL CIRCUITS 5.4.11 TEST FOR SEPARATION BETWEEN EXTERNAL CIRCUITS AND EARTH 5.4.8 HUMIDITY CONDITIONING 5.4.9 ELECTRIC STRENGTH 5.5.2.2 SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR 5.6.6 RESISTANCE OF THE PROTECTIVE BONDING SYSTEM 5.7 PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT 5.7.5 PROTECTIVE CONDUCTOR CURRENT 6.2.2.2, 6.2.2.3 POWER MEASUREMENTS 6.2.3.1 ARCING PIS DETERMINATION 6.2.3.2 RESISTIVE PIS DETERMINATION 6.4.8.3.3, ANNEX S.2 TOP OPENINGS AND TOP OPENING PROPERTIES 8.10.3 CART, STAND OR CARRIER LOADING 8.11.3 RACK MOUNTED EQUIPMENT – MOUNTING MEANS: MECHANICAL STRENGTH TEST 8.11.4 RACK MOUNTED EQUIPMENT – MOUNTING MEANS: MECHANICAL STRENGTH TEST, 250 N, INCLUDING END STOPS 8.5.4.2.4 ELECTROMECHANICAL EQUIPMENT – DESTRUCTION OF MEDIA 8.6.2 STATIC STABILITY 8.6.3 RELOCATION STABILITY TEST 8.6.4 GLASS SLIDE TEST 8.6.5 HORIZONTAL FORCE TEST 8.7 WALL OR CEILING MOUNTING TESTS 8.8 HANDLE STRENGTH 8.9 WHEEL OR CASTER SECUREMENT ANNEX B.2.5 INPUT TEST: TELEVISION RECEIVERS/MONITORS ANNEX B.2.5 INPUT TEST: PRODUCTS CONTAINING AN AUDIO AMPLIFIER ANNEX B.2.5 INPUT TEST: SINGLE PHASE ANNEX B.2.6 NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENT ANNEX B.3 SIMULATED ABNORMAL OPERATING CONDITIONS ANNEX B.4 SIMULATED SINGLE FAULT CONDITIONS ANNEX F.3.10 TEST FOR THE PERMANENCE OF MARKINGS ANNEX M.4.2 SECONDARY LITHIUM BATTERY CHARGING SAFEGUARDS ANNEX M.6.2 LEAKAGE CURRENTS FROM BATTERY CIRCUITS ANNEX P.2.3.2 CONSEQUENCE OF ENTRY TEST ANNEX P.4.2 METALLIZED COATINGS AND ADHESIVES SECURING PARTS ANNEX T.11 (8.12) TEST FOR TELESCOPING OR ROD ANTENNAS ANNEX T.2 - T.5 STEADY FORCE TEST (10N, 30N, 100N, 250N) ANNEX T.6 ENCLOSURE IMPACT TEST ANNEX T.7 DROP TEST ANNEX T.8 STRESS RELIEF TEST ANNEX T.9 (GLASS) IMPACT TEST
2015-05-29
MISCIEC 60825-1:2014
5.0 DETERMINATION OF THE ACCESSIBLE EMISSION LEVEL AND PRODUCT CLASSIFICATION 5.1 TESTS 5.2 MEASUREMENT OF LASER RADIATION 5.4 MEASUREMENT GEOMETRY 5.4.1 GENERAL 5.4.2 DEFAULT (SIMPLIFIED) EVALUATION 5.4.3 EVALUATION CONDITION FOR EXTENDED SOURCES
2015-05-29
MISCIEC 60825-1:2007
9 DETERMINATION OF THE ACCESSIBLE EMISSION LEVEL 9.1 TESTS 9.2 MEASUREMENT OF LASER RADIATION 9.3 MEASUREMENT GEOMETRY 9.3.1 GENERAL 9.3.2 DEFAULT (SIMPLIFIED) EVALUATION 9.3.3 EVALUATION CONDITION FOR EXTENDED SOURCES
2015-01-06
OFFIEC 60950-1:2005
1.6.2 INPUT: SINGLE-PHASE 1.7.11 DURABILITY 2.1.1.1, 2.8.2 ACCESS TO ENERGIZED PARTS 2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS 2.1.1.7 CAPACITANCE DISCHARGE TEST 2.1.1.9 AUDIO AMPLIFIER TOUCH CURRENT 2.10.2 DETERMINATION OF WORKING VOLTAGE; VOLTAGE MEASUREMENT 2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS 2.5 LIMITED POWER SOURCE MEASUREMENTS 2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I 2.9.1, 2.9.2, 5.2.2 HUMIDITY 3.1.9 CONDUCTOR TERMINATIONS - STEADY FORCE TEST 3.2.6, 4.2.1, 4.2.7 STRAIN RELIEF 3.2.8 CORD GUARD 4.1 STABILITY TESTS 4.2.10 LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT 4.2.1-4.2.4 STEADY FORCE TESTS 4.2.5, 4.2.1 IMPACT 4.2.6, 4.2.1 DROP TEST 4.2.7, 4.2.1 STRESS RELIEF TEST 4.3.2 KNOB PULL/HANDLE LOADING 4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST 4.4.2, 4.4.4 HAZARDOUS MOVING PARTS 4.5.1, 1.4.12, 1.4.13 HEATING TEST 5.1, ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM) 5.2.2 ELECTRIC STRENGTH TEST 5.3.1 - 5.3.9 ABNORMAL OPERATION TESTS 5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST 5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR ANNEX DD RACK MOUNTED EQUIPMENT - MECHANICAL STRENGTH
2015-05-29
OFFIEC 60950-1:2005/AMD1:2009
1.6.2 INPUT: SINGLE-PHASE 1.7.11 DURABILITY 2.1.1.1, 2.8.2 ACCESS TO ENERGIZED PARTS 2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS 2.1.1.7 CAPACITANCE DISCHARGE TEST 2.1.1.9 AUDIO AMPLIFIER TOUCH CURRENT 2.10.2 DETERMINATION OF WORKING VOLTAGE; VOLTAGE MEASUREMENT 2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS 2.5 LIMITED POWER SOURCE MEASUREMENTS 2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I 2.9.1, 2.9.2, 5.2.2 HUMIDITY 3.1.9 CONDUCTOR TERMINATIONS - STEADY FORCE TEST 3.2.6, 4.2.1, 4.2.7 STRAIN RELIEF 3.2.8 CORD GUARD 4.1 STABILITY TESTS 4.2.10 LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT 4.2.1-4.2.4 STEADY FORCE TESTS 4.2.5, 4.2.1 IMPACT 4.2.6, 4.2.1 DROP TEST 4.2.7, 4.2.1 STRESS RELIEF TEST 4.3.2 KNOB PULL/HANDLE LOADING 4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST 4.4.2, 4.4.4 HAZARDOUS MOVING PARTS 4.5.1, 1.4.12, 1.4.13 HEATING TEST 5.1, ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM) 5.2.2 ELECTRIC STRENGTH TEST 5.3.1 - 5.3.9 ABNORMAL OPERATION TESTS 5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST 5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR ANNEX DD RACK MOUNTED EQUIPMENT - MECHANICAL STRENGTH
2015-05-29
OFFIEC 60950-1:2005/AMD2:2013
1.6.2 INPUT: SINGLE-PHASE 1.7.11 DURABILITY 2.1.1.1, 2.8.2 ACCESS TO ENERGIZED PARTS 2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS 2.1.1.7 CAPACITANCE DISCHARGE TEST 2.1.1.9 AUDIO AMPLIFIER TOUCH CURRENT 2.10.2 DETERMINATION OF WORKING VOLTAGE; VOLTAGE MEASUREMENT 2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS 2.5 LIMITED POWER SOURCE MEASUREMENTS 2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I 2.9.1, 2.9.2, 5.2.2 HUMIDITY 3.1.9 CONDUCTOR TERMINATIONS - STEADY FORCE TEST 3.2.6, 4.2.1, 4.2.7 STRAIN RELIEF 3.2.8 CORD GUARD 4.1 STABILITY TESTS 4.2.10 LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT 4.2.1-4.2.4 STEADY FORCE TESTS 4.2.5, 4.2.1 IMPACT 4.2.6, 4.2.1 DROP TEST 4.2.7, 4.2.1 STRESS RELIEF TEST 4.3.2 KNOB PULL/HANDLE LOADING 4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST 4.4.2, 4.4.4 HAZARDOUS MOVING PARTS 4.5.1, 1.4.12, 1.4.13 HEATING TEST 5.1, ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM) 5.2.2 ELECTRIC STRENGTH TEST 5.3.1 - 5.3.9 ABNORMAL OPERATION TESTS 5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST 5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR ANNEX DD RACK MOUNTED EQUIPMENT - MECHANICAL STRENGTH
2015-05-29
TRONIEC 60065:2001
10.2 HUMIDITY TREATMENT 10.3 INSULATION RESISTANCE AND DIELECTRIC STRENGTH AFTER HUMIDITY TREATMENT 12.1.3 DIELECTRIC STRENGTH AFTER IMPACT TEST 12.1.3 IMPACT 12.1.4 DROP TEST 12.1.4 DIELECTRIC STRENGTH AFTER DROP TEST 12.1.5 STRESS RELIEF TEST 12.2 FIXING OF ACTUATING ELEMENTS 12.4 DRAWER MECHANICAL STRENGTH 15.2 PROTECTIVE EARTH TERMINAL RESISTANCE TEST 16.5 MAINS FLEXIBLE CORD STRAIN AND TORQUE TEST 16.5 MAINS FLEXIBLE CORD STRAIN AND TORQUE TEST FOLLOWING STRESS RELIEF CONDITIONING 17.1 SCREW SECUREMENT TEST 17.7 COVER-FIXING DEVICES TEST 19.1 TEST AT 10° TO THE HORIZONTAL 19.2 VERTICAL FORCE TEST 19.3 HORIZONTAL FORCE TEST 19.6 WALL OR CEILING OR EQUIPMENT RACK MOUNTING TEST 19.6 WALL OR CEILING OR EQUIPMENT RACK MOUNTING TEST FOLLOWING STRESS RELIEF CONDITIONING 4.2 INPUT TEST FOR APPARATUS EMPLOYING SIGNAL INPUTS AND NOT CONTAINING AN AUDIO AMPLIFIER 4.3.1, 4.3.2, 4.3.4 FAULT CONDITIONS: CLEARANCE AND CREEPAGE, INSULATING MATERIALS AND ELECTRONIC COMPONENTS 4.3.10 FAULT CONDITIONS: VENTILATION OPENINGS BLOCKED 4.3.6 FAULT CONDITIONS, FAN FAILURE/STALLED ROTOR 4.3.9 FAULT CONDITIONS, OUTPUT TERMINAL OVERLOAD 5 MARKING DURABILITY AND LEGIBILITY 7 HEATING UNDER NORMAL OPERATING CONDITIONS 8.13 WINDOWS, LENSES EXTERNAL FORCE TEST 8.14 COVERS, EXTERNAL FORCE TEST 8.3 HUMIDITY TREATMENT OF HYGROSCOPIC INSULATING MATERIALS 9.1.1 TOUCH CURRENT 9.1.6 WITHDRAWAL OF MAINS PLUG 9.1.7 ENCLOSURE RESISTANCE TO EXTERNAL FORCES TEST
2017-05-03
TRONIEC 60065:2001/AMD1:2005
10.2 HUMIDITY TREATMENT 10.3 INSULATION RESISTANCE AND DIELECTRIC STRENGTH AFTER HUMIDITY TREATMENT 12.1.3 DIELECTRIC STRENGTH AFTER IMPACT TEST 12.1.3 IMPACT 12.1.4 DROP TEST 12.1.4 DIELECTRIC STRENGTH AFTER DROP TEST 12.1.5 STRESS RELIEF TEST 12.2 FIXING OF ACTUATING ELEMENTS 12.4 DRAWER MECHANICAL STRENGTH 15.2 PROTECTIVE EARTH TERMINAL RESISTANCE TEST 16.5 MAINS FLEXIBLE CORD STRAIN AND TORQUE TEST 16.5 MAINS FLEXIBLE CORD STRAIN AND TORQUE TEST FOLLOWING STRESS RELIEF CONDITIONING 17.1 SCREW SECUREMENT TEST 17.7 COVER-FIXING DEVICES TEST 19.1 TEST AT 10° TO THE HORIZONTAL 19.2 VERTICAL FORCE TEST 19.3 HORIZONTAL FORCE TEST 19.6 WALL OR CEILING OR EQUIPMENT RACK MOUNTING TEST 19.6 WALL OR CEILING OR EQUIPMENT RACK MOUNTING TEST FOLLOWING STRESS RELIEF CONDITIONING 4.2 INPUT TEST FOR APPARATUS EMPLOYING SIGNAL INPUTS AND NOT CONTAINING AN AUDIO AMPLIFIER 4.3.1, 4.3.2, 4.3.4 FAULT CONDITIONS: CLEARANCE AND CREEPAGE, INSULATING MATERIALS AND ELECTRONIC COMPONENTS 4.3.10 FAULT CONDITIONS: VENTILATION OPENINGS BLOCKED 4.3.6 FAULT CONDITIONS, FAN FAILURE/STALLED ROTOR 4.3.9 FAULT CONDITIONS, OUTPUT TERMINAL OVERLOAD 5 MARKING DURABILITY AND LEGIBILITY 7 HEATING UNDER NORMAL OPERATING CONDITIONS 8.13 WINDOWS, LENSES EXTERNAL FORCE TEST 8.14 COVERS, EXTERNAL FORCE TEST 8.3 HUMIDITY TREATMENT OF HYGROSCOPIC INSULATING MATERIALS 9.1.1 TOUCH CURRENT 9.1.6 WITHDRAWAL OF MAINS PLUG 9.1.7 ENCLOSURE RESISTANCE TO EXTERNAL FORCES TEST
2017-05-03
TRONIEC 60065:2001/AMD2:2010
10.2 HUMIDITY TREATMENT 10.3 INSULATION RESISTANCE AND DIELECTRIC STRENGTH AFTER HUMIDITY TREATMENT 12.1.3 DIELECTRIC STRENGTH AFTER IMPACT TEST 12.1.3 IMPACT 12.1.4 DROP TEST 12.1.4 DIELECTRIC STRENGTH AFTER DROP TEST 12.1.5 STRESS RELIEF TEST 12.2 FIXING OF ACTUATING ELEMENTS 12.4 DRAWER MECHANICAL STRENGTH 15.2 PROTECTIVE EARTH TERMINAL RESISTANCE TEST 16.5 MAINS FLEXIBLE CORD STRAIN AND TORQUE TEST 16.5 MAINS FLEXIBLE CORD STRAIN AND TORQUE TEST FOLLOWING STRESS RELIEF CONDITIONING 17.1 SCREW SECUREMENT TEST 17.7 COVER-FIXING DEVICES TEST 19.1 TEST AT 10° TO THE HORIZONTAL 19.2 VERTICAL FORCE TEST 19.3 HORIZONTAL FORCE TEST 19.6 WALL OR CEILING OR EQUIPMENT RACK MOUNTING TEST 19.6 WALL OR CEILING OR EQUIPMENT RACK MOUNTING TEST FOLLOWING STRESS RELIEF CONDITIONING 4.2 INPUT TEST FOR APPARATUS EMPLOYING SIGNAL INPUTS AND NOT CONTAINING AN AUDIO AMPLIFIER 4.3.1, 4.3.2, 4.3.4 FAULT CONDITIONS: CLEARANCE AND CREEPAGE, INSULATING MATERIALS AND ELECTRONIC COMPONENTS 4.3.10 FAULT CONDITIONS: VENTILATION OPENINGS BLOCKED 4.3.6 FAULT CONDITIONS, FAN FAILURE/STALLED ROTOR 4.3.9 FAULT CONDITIONS, OUTPUT TERMINAL OVERLOAD 5 MARKING DURABILITY AND LEGIBILITY 7 HEATING UNDER NORMAL OPERATING CONDITIONS 8.13 WINDOWS, LENSES EXTERNAL FORCE TEST 8.14 COVERS, EXTERNAL FORCE TEST 8.3 HUMIDITY TREATMENT OF HYGROSCOPIC INSULATING MATERIALS 9.1.1 TOUCH CURRENT 9.1.6 WITHDRAWAL OF MAINS PLUG 9.1.7 ENCLOSURE RESISTANCE TO EXTERNAL FORCES TEST
2017-05-03