CTF

IBM Corp.

 
  •  

Standards in Scope

Category
Standard
Tests/Clauses
Acceptance Date
Responsible National Certification Body(s)
ITAVIEC 62368-1:2014
5.4.1.4, ANNEX B.2 MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS 5.4.9 ELECTRIC STRENGTH ANNEX B.2.5 INPUT TEST: SINGLE PHASE ANNEX T.2 - T.5 STEADY FORCE TEST (10N, 30N, 100N, 250N) G.7.3 CORD ANCHORAGES AND STRAIN RELIEF FOR NON-DETACHABLE POWER SUPPLY CORDS Q.1 LIMITED POWER SOURCE
2014-12-16
OFFIEC 60950-1:2005
1.6.2 INPUT TEST: SINGLE-PHASE 1.6.2 INPUT TEST: POLYPHASE 2.1.1.1, 2.8.2 ACCESS TO ENERGIZED PARTS 2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS 2.1.1.7 CAPACITANCE DISCHARGE 2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT 2.10.3 CLEARANCES 2.10.4 CREEPAGE DISTANCES 2.5 LIMITED POWER SOURCE MEASUREMENTS 2.6.3.4, 2.6.1 PROTECTIVE BONDING II 2.6.3.4, 2.6.1 PROTECTIVE BONDING I 2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST 3.2.6, 4.2.1, 4.2.7 STRAIN RELIEF TEST 4.1 STABILITY 4.2.1 - 4.2.4 STEADY FORCE TESTS 4.2.5, 4.2.1 IMPACT 4.3.1 SHARP EDGE 4.3.2 KNOB PULL/HANDLE LOADING 4.3.5 CONNECTOR CURRENT INTERRUPTION 4.3.8 BATTERY 4.4.2, 4.4.4 HAZARDOUS MOVING PARTS 4.5.1, 1.4.12, 1.4.13 HEATING TEST 5.1, ANNEX D TOUCH CURRENT TEST (POLYPHASE; TN/TT SYSTEM) 5.1, ANNEX D TOUCH CURRENT (SINGLE-PHASE; TN/TT SYSTEM) 5.2.2 ELECTRIC STRENGTH 5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE 5.3.1-5.3.9 ABNORMAL OPERATION TESTS ANNEX B.5 and B.8 LOCKED ROTOR OVERLOAD AND ENDURANCE ANNEX B.7 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS ANNEX B.9 TEST FOR THREE-PHASE MOTORS
2014-12-16
OFFIEC 60950-1:2005/AMD1:2009
1.6.2 INPUT TEST: SINGLE-PHASE 1.6.2 INPUT TEST: POLYPHASE 2.1.1.1, 2.8.2 ACCESS TO ENERGIZED PARTS 2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS 2.1.1.7 CAPACITANCE DISCHARGE 2.10.10, 2.10.9 POLLUTION DEGREE 1 ENVIRONMENTAL AND INSULATING COMPOUND 2.10.11, 2.10.9 SEMICONDUCTOR DEVICES AND CEMENTED JOINTS 2.10.2 DETERMINATION OF WORKING VOLTAGE - HAZARDOUS VOLTAGE (CIRCUIT) MEASUREMENT 2.10.2 DETERMINATION OF WORKING VOLTAGE - SECONDARY OUTPUT VOLTAGE 2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT 2.5 LIMITED POWER SOURCE MEASUREMENTS 2.6.3.4, 2.6.1 PROTECTIVE BONDING I 2.6.3.4, 2.6.1 PROTECTIVE BONDING II 2.9.1, 2.9.2, 5.2.2 HUMIDITY 3.2.6, 4.2.1, 4.2.7 STRAIN RELIEF 4.1 STABILITY 4.2.1-4.2.4 STEADY FORCE 4.2.5, 4.2.1 IMPACT 4.3.1 SHARP EDGE 4.3.2 KNOB PULL/HANDLE LOADING 4.3.5 CONNECTOR CURRENT INTERRUPTION 4.3.8 BATTERY 4.4.2, 4.4.4 HAZARDOUS MOVING PARTS 4.5 HEATING 5.1, ANNEX D TOUCH CURRENT (POLYPHASE; TN/TT SYSTEM) 5.1, ANNEX D TOUCH CURRENT (SINGLE-PHASE; TN/TT SYSTEM) 5.2.2 ELECTRIC STRENGTH 5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE 5.3.1-5.3.9 ABNORMAL OPERATION ANNEX B.5 and B.8 LOCKED ROTOR OVERLOAD AND ENDURANCE ANNEX B.7 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS ANNEX B.9 TEST FOR THREE-PHASE MOTORS ANNEX DD RACK MOUNTED EQUIPMENT - MECHANICAL STRENGTH
2014-12-16
OFFIEC 60950-1:2005/AMD2:2013
1.6.2 INPUT TEST: POLYPHASE "1.6.2 " INPUT: SINGLE-PHASE 2.1.1.1, 2.8.2 ACCESS TO ENERGIZED PARTS "2.1.1.5, 2.1.2, 1.2.8.10 " ENERGY HAZARD MEASUREMENTS 2.1.1.7 " CAPACITANCE DISCHARGE TEST" 2.10.10, 2.10.9 POLLUTION DEGREE 1 ENVIRONMENTAL AND INSULATING COMPOUND 2.10.11, 2.10.9 SEMICONDUCTOR DEVICES AND CEMENTED JOINTS 2.10.2 DETERMINATION OF WORKING VOLTAGE - SECONDARY OUTPUT VOLTAGE 2.10.2 " DETERMINATION OF WORKING VOLTAGE; VOLTAGE MEASUREMENT" "2.10.2, PART 22 6.1 " DETERMINATION OF WORKING VOLTAGE; HAZARDOUS VOLTAGE (CIRCUIT) 2.5 " LIMITED POWER SOURCE MEASUREMENTS" 2.6.3.4, 2.6.1 " PROTECTIVE BONDING TEST I" 2.6.3.4, 2.6.1 " PROTECTIVE BONDING TEST II" 2.9.1, 2.9.2, 5.2.2 " HUMIDITY" 3.2.6, 4.2.1, 4.2.7 STRAIN RELIEF "4.1 " STABILITY TESTS "4.2.1-4.2.4 " STEADY FORCE TESTS 4.2.5, 4.2.1 IMPACT 4.3.1 SHARP EDGE 4.3.2 KNOB PULL/HANDLE LOADING 4.3.5 CONNECTOR CURRENT INTERRUPTION 4.3.8 " BATTERY TEST" 4.4.2, 4.4.4 HAZARDOUS MOVING PARTS 4.5.1, 1.4.12, 1.4.13 " HEATING TEST" 5.1, ANNEX D TOUCH CURRENT (POLYPHASE; TN/TT SYSTEM) "5.1, ANNEX D " TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM) 5.2.2 " ELECTRIC STRENGTH TEST" 5.3.1 - 5.3.9 " ABNORMAL OPERATION TESTS" "5.3.1, 5.3.4, 5.3.7 " COMPONENT FAILURE TEST ANNEX B.7 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS "ANNEX DD " RACK MOUNTED EQUIPMENT - MECHANICAL STRENGTH B.5, B.8 LOCKED ROTOR OVERLOAD AND ENDURANCE B.9 TEST FOR THREE-PHASE MOTORS
2014-12-16