CTF

Hitachi Information & Telecommunication Engineering, Ltd.

 
  •  

Standards in Scope

Category
Standard
Tests/Clauses
Acceptance Date
Responsible National Certification Body(s)
ITAVIEC 62368-1:2014
1.6.2 - INPUT TEST: SINGLE-PHASE 1.6.2 - INPUT TEST: SINGLE-PHASE 1.7.11 - DURABILITY OF MARKING TEST 1.7.11 - DURABILITY OF MARKING TEST 2.1.1.1, 2.8.2, PART 21 4.2 ACCESS TO ENERGIZED PARTS TEST 2.1.1.1, 2.8.2, PART 21 4.2 ACCESS TO ENERGIZED PARTS TEST 2.1.1.7 - CAPACITANCE DISCHARGE TEST 2.1.1.7 - CAPACITANCE DISCHARGE TEST 2.5 - LIMITED POWER SOURCE MEASUREMENTS 2.5 - LIMITED POWER SOURCE MEASUREMENTS 2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I 2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I 5.6.6.2(a) – RESISTANCE OF THE PROTECTIVE BONDING SYSTEM 0 5.7 – PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT 0 6.2.2.2, 6.2.2.3 – POWER MEASUREMENTS 0 6.2.3.2 – RESISTIVE PIS DETERMINATION 0 B.2.5 – INPUT TEST: SINGLE PHASE 0 B.2.6 – NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENT 0 B.3 – SIMULATED ABNORMAL OPERATING CONDITIONS 0 B.4 – SIMULATED SINGLE FAULT CONDITIONS 0 ANNEX F.3.10 – TEST FOR THE PERMANENCE OF MARKINGS 0 ANNEX Q.1 – LIMITED POWER SOURCE 0 ANNEX T.2 , 5.4.2.6, 5.4.3.2, G.15.3.6 – STEADY FORCE TEST, 10 N 0
2019-07-05
OFFIEC 60950-1:2005
1.6.2 - INPUT TEST: SINGLE-PHASE 1.7.11 - DURABILITY OF MARKING TEST 2.1.1.1, 2.8.2, PART 21 4.2 ACCESS TO ENERGIZED PARTS TEST 2.1.1.7 - CAPACITANCE DISCHARGE TEST 2.5 - LIMITED POWER SOURCE MEASUREMENTS 2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I 2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST 4.2.1 – 4.2.4 - STEADY FORCE TESTS 4.2.5, 4.2.1, Part 22 10.2 - IMPACT TEST 4.5.1, 1.4.12, 1.4.13 - HEATING TEST 5.1, Annex D - TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM) 5.2.2 - ELECTRIC STRENGTH TEST 5.3.1 – 5.3.9 - ABNORMAL OPERATION 5.3.1, 5.3.4, 5.3.7 - COMPONENT FAILURE TEST 5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST Annex B.7 - LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS
2019-07-05
OFFIEC 60950-1:2005/AMD1:2009
1.6.2 - INPUT TEST: SINGLE-PHASE 1.7.11 - DURABILITY OF MARKING TEST 2.1.1.1, 2.8.2, PART 21 4.2 ACCESS TO ENERGIZED PARTS TEST 2.1.1.7 - CAPACITANCE DISCHARGE TEST 2.5 - LIMITED POWER SOURCE MEASUREMENTS 2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I 2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST 4.2.1 – 4.2.4 - STEADY FORCE TESTS 4.2.5, 4.2.1, Part 22 10.2 - IMPACT TEST 4.5.1, 1.4.12, 1.4.13 - HEATING TEST 5.1, Annex D - TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM) 5.2.2 - ELECTRIC STRENGTH TEST 5.3.1 – 5.3.9 - ABNORMAL OPERATION 5.3.1, 5.3.4, 5.3.7 - COMPONENT FAILURE TEST 5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST Annex B.7 - LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS
2019-07-05
OFFIEC 60950-1:2005/AMD2:2013
1.6.2 - INPUT TEST: SINGLE-PHASE 1.7.11 - DURABILITY OF MARKING TEST 2.1.1.1, 2.8.2, PART 21 4.2 ACCESS TO ENERGIZED PARTS TEST 2.1.1.7 - CAPACITANCE DISCHARGE TEST 2.5 - LIMITED POWER SOURCE MEASUREMENTS 2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I 2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST 4.2.1 – 4.2.4 - STEADY FORCE TESTS 4.2.5, 4.2.1, Part 22 10.2 - IMPACT TEST 4.5.1, 1.4.12, 1.4.13 - HEATING TEST 5.1, Annex D - TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM) 5.2.2 - ELECTRIC STRENGTH TEST 5.3.1 – 5.3.9 - ABNORMAL OPERATION 5.3.1, 5.3.4, 5.3.7 - COMPONENT FAILURE TEST 5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST Annex B.7 - LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS
2019-07-05