CTF

Cisco Systems Inc.

 
  •  

Standards in Scope

Category
Standard
Tests/Clauses
Acceptance Date
Responsible National Certification Body(s)
OFFIEC 60950-1:2005
1.6.2 INPUT TEST: POLYPHASE "1.6.2 " INPUT: SINGLE-PHASE 1.7.11 DURABILITY OF MARKING TEST 2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENT 2.1.1.7 " CAPACITANCE DISCHARGE TEST" 2.2.2, 2.2.3, 2.2.4 SELV RELIABILITY 2.3.1 TNV-1, TNV-2, TNV-3 LIMITS (NORMAL) 2.3.1, 2.3.4 TNV-1, TNV-2, TNV-3 LIMITS (SINGLE FAULT) 2.3.1, ANNEX M.2 CRITERIA FOR TELEPHONE RINGING AND OTHER SIGNALS TEST (METHOD A EUROPE) 2.3.1b, ANNEX M.3.1 - M.3.2.3 CRITERIA FOR TELEPHONE RINGING TEST (METHOD B NORTH AMERICA) 2.3.2.1, 2.3.2.2 SEPARATION FROM OTHER CIRCUITS AND ACCESSIBLE PARTS (BASIC INSULATION) 2.3.2, 2.3.2.3 SEPARATION FROM OTHER CIRCUITS AND ACCESSIBLE PARTS (PROTECTION BY EARTHING) 2.3.2, 2.3.2.4 SEPARATION FROM OTHER CIRCUITS AND ACCESSIBLE PARTS (PROTECTION BY OTHER CONSTRUCTION) 2.3.5 OPERATING VOLTAGES GENERATED EXTERNALLY 2.4.1, 2.4.2 LIMITED CURRENT CIRCUITS MEASUREMENTS 2.5 " LIMITED POWER SOURCE MEASUREMENTS" 2.6.3.4, 2.6.1 " PROTECTIVE BONDING TEST I" 2.6.3.4, 2.6.1 " PROTECTIVE BONDING TEST II" 2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST 2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENTS 3.3.8, 3.2.9 CONDUCTOR TERMINATIONS - STEADY FORCE TEST 4.1 STABILITY 4.2.1 - 4.2.4 STEADY FORCE TESTS 4.2.5, 4.2.1 IMPACT 4.2.6, 4.2.1 DROP 4.2.7, 4.2.1 STRESS RELIEF TEST 4.2.10 LOADING 4.3.2 KNOB PULL/HANDLE LOADING 4.3.5 CONNECTOR CURRENT INTERRUPTION 4.3.8 BATTERY TESTS 4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST 4.4.2, 4.4.4 HAZARDOUS MOVING PARTS 4.5.1, 1.4.12, 1.4.13 " HEATING TEST" 4.5.5, 4.5 BALL PRESSURE TEST 4.6.5 BARRIER ADHESIVE TEST 5.1, ANNEX D TOUCH CURRENT (POLYPHASE/POLYPHASE; TN/TT SYSTEM) 5.1.8.1 LIMITATION OF THE TOUCH CURRENT TO A TELECOMMUNICATIONS NETWORK AND A CABLE DISTRIBUTION SYSTEM (SINGLE-PHASE) 5.1.8.3 LIMITATION OF TOUCH CURRENT DUE TO RINGING SIGNALS 5.2.2 " ELECTRIC STRENGTH TEST" 5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST 5.3.1 - 5.3.9 " ABNORMAL OPERATION TESTS" 5.3.4, 5.2 ELECTRIC STRENGTH TEST (FOR SPACING DEFICIENT PWB) 5.3.7 " OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR" 6.1.2 REQUIREMENTS FOR SEPARATION BETWEEN TELECOMMUNICATION NETWORK FROM EARTH 6.2.2 (6.2.2.1) ELECTRIC STRENGTH TEST PROCEDURE (IMPULSE TEST) 6.2.2 (6.2.2.2) ELECTRIC STRENGTH TEST PROCEDURE (STEADY STATE TEST) 7.3, 6.2.2, 6.2.2.1 CABLE DISTRIBUTION SYSTEM, ELECTRIC STRENGTH TEST PROCEDURE, IMPULSE TEST 7.3, 6.2.2, 6.2.2.2 CABLE DISTRIBUTION SYSTEM, ELECTRIC STRENGTH TEST PROCEDURE, STEADY STATE TEST 7.4.2 CABLE DISTRIBUTION SYSTEMS, VOLTAGE SURGE TEST 7.4.3 CABLE DISTRIBUTION SYSTEMS, IMPULSE TEST ANNEX B.7 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS
2014-06-18
OFFIEC 60950-1:2005/AMD1:2009
1.6.2 INPUT TEST: POLYPHASE "1.6.2 " INPUT: SINGLE-PHASE 1.7.11 DURABILITY OF MARKING TEST 2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENT 2.1.1.7 " CAPACITANCE DISCHARGE TEST" 2.2.2, 2.2.3, 2.2.4 SELV RELIABILITY 2.3.1 TNV-1, TNV-2, TNV-3 LIMITS (NORMAL) 2.3.1, 2.3.4 TNV-1, TNV-2, TNV-3 LIMITS (SINGLE FAULT) 2.3.1, ANNEX M.2 CRITERIA FOR TELEPHONE RINGING AND OTHER SIGNALS TEST (METHOD A EUROPE) 2.3.1b, ANNEX M.3.1 - M.3.2.3 CRITERIA FOR TELEPHONE RINGING TEST (METHOD B NORTH AMERICA) 2.3.2.1, 2.3.2.2 SEPARATION FROM OTHER CIRCUITS AND ACCESSIBLE PARTS (BASIC INSULATION) 2.3.2, 2.3.2.3 SEPARATION FROM OTHER CIRCUITS AND ACCESSIBLE PARTS (PROTECTION BY EARTHING) 2.3.2, 2.3.2.4 SEPARATION FROM OTHER CIRCUITS AND ACCESSIBLE PARTS (PROTECTION BY OTHER CONSTRUCTION) 2.3.5 OPERATING VOLTAGES GENERATED EXTERNALLY 2.4.1, 2.4.2 LIMITED CURRENT CIRCUITS MEASUREMENTS 2.5 " LIMITED POWER SOURCE MEASUREMENTS" 2.6.3.4, 2.6.1 " PROTECTIVE BONDING TEST I" 2.6.3.4, 2.6.1 " PROTECTIVE BONDING TEST II" 2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST 2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENTS 3.3.8, 3.2.9 CONDUCTOR TERMINATIONS - STEADY FORCE TEST 4.1 STABILITY 4.2.1 - 4.2.4 STEADY FORCE TESTS 4.2.5, 4.2.1 IMPACT 4.2.6, 4.2.1 DROP 4.2.7, 4.2.1 STRESS RELIEF TEST 4.2.10 LOADING 4.3.2 KNOB PULL/HANDLE LOADING 4.3.5 CONNECTOR CURRENT INTERRUPTION 4.3.8 BATTERY TESTS 4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST 4.4.2, 4.4.4 HAZARDOUS MOVING PARTS 4.5.1, 1.4.12, 1.4.13 " HEATING TEST" 4.5.5, 4.5 BALL PRESSURE TEST 4.6.5 BARRIER ADHESIVE TEST 5.1, ANNEX D TOUCH CURRENT (POLYPHASE/POLYPHASE; TN/TT SYSTEM) 5.1.8.1 LIMITATION OF THE TOUCH CURRENT TO A TELECOMMUNICATIONS NETWORK AND A CABLE DISTRIBUTION SYSTEM (SINGLE-PHASE) 5.1.8.3 LIMITATION OF TOUCH CURRENT DUE TO RINGING SIGNALS 5.2.2 " ELECTRIC STRENGTH TEST" 5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST 5.3.1 - 5.3.9 " ABNORMAL OPERATION TESTS" 5.3.4, 5.2 ELECTRIC STRENGTH TEST (FOR SPACING DEFICIENT PWB) 5.3.7 " OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR" 6.1.2 REQUIREMENTS FOR SEPARATION BETWEEN TELECOMMUNICATION NETWORK FROM EARTH 6.2.2 (6.2.2.1) ELECTRIC STRENGTH TEST PROCEDURE (IMPULSE TEST) 6.2.2 (6.2.2.2) ELECTRIC STRENGTH TEST PROCEDURE (STEADY STATE TEST) 7.3, 6.2.2, 6.2.2.1 CABLE DISTRIBUTION SYSTEM, ELECTRIC STRENGTH TEST PROCEDURE, IMPULSE TEST 7.3, 6.2.2, 6.2.2.2 CABLE DISTRIBUTION SYSTEM, ELECTRIC STRENGTH TEST PROCEDURE, STEADY STATE TEST 7.4.2 CABLE DISTRIBUTION SYSTEMS, VOLTAGE SURGE TEST 7.4.3 CABLE DISTRIBUTION SYSTEMS, IMPULSE TEST ANNEX B.7 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS
2014-06-18
OFFIEC 60950-1:2005/AMD2:2013
1.6.2 INPUT TEST: POLYPHASE "1.6.2 " INPUT: SINGLE-PHASE 1.7.11 DURABILITY OF MARKING TEST 2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENT 2.1.1.7 " CAPACITANCE DISCHARGE TEST" 2.2.2, 2.2.3, 2.2.4 SELV RELIABILITY 2.3.1 TNV-1, TNV-2, TNV-3 LIMITS (NORMAL) 2.3.1, 2.3.4 TNV-1, TNV-2, TNV-3 LIMITS (SINGLE FAULT) 2.3.1, ANNEX M.2 CRITERIA FOR TELEPHONE RINGING AND OTHER SIGNALS TEST (METHOD A EUROPE) 2.3.1b, ANNEX M.3.1 - M.3.2.3 CRITERIA FOR TELEPHONE RINGING TEST (METHOD B NORTH AMERICA) 2.3.2.1, 2.3.2.2 SEPARATION FROM OTHER CIRCUITS AND ACCESSIBLE PARTS (BASIC INSULATION) 2.3.2, 2.3.2.3 SEPARATION FROM OTHER CIRCUITS AND ACCESSIBLE PARTS (PROTECTION BY EARTHING) 2.3.2, 2.3.2.4 SEPARATION FROM OTHER CIRCUITS AND ACCESSIBLE PARTS (PROTECTION BY OTHER CONSTRUCTION) 2.3.5 OPERATING VOLTAGES GENERATED EXTERNALLY 2.4.1, 2.4.2 LIMITED CURRENT CIRCUITS MEASUREMENTS 2.5 " LIMITED POWER SOURCE MEASUREMENTS" 2.6.3.4, 2.6.1 " PROTECTIVE BONDING TEST I" 2.6.3.4, 2.6.1 " PROTECTIVE BONDING TEST II" 2.9.1, 2.9.2, 5.2.2 HUMIDITY TEST 2.10.2 DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENTS 3.3.8, 3.2.9 CONDUCTOR TERMINATIONS - STEADY FORCE TEST 4.1 STABILITY 4.2.1 - 4.2.4 STEADY FORCE TESTS 4.2.5, 4.2.1 IMPACT 4.2.6, 4.2.1 DROP 4.2.7, 4.2.1 STRESS RELIEF TEST 4.2.10 LOADING 4.3.2 KNOB PULL/HANDLE LOADING 4.3.5 CONNECTOR CURRENT INTERRUPTION 4.3.8 BATTERY TESTS 4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST 4.4.2, 4.4.4 HAZARDOUS MOVING PARTS 4.5.1, 1.4.12, 1.4.13 " HEATING TEST" 4.5.5, 4.5 BALL PRESSURE TEST 4.6.5 BARRIER ADHESIVE TEST 5.1, ANNEX D TOUCH CURRENT (POLYPHASE/POLYPHASE; TN/TT SYSTEM) 5.1.8.1 LIMITATION OF THE TOUCH CURRENT TO A TELECOMMUNICATIONS NETWORK AND A CABLE DISTRIBUTION SYSTEM (SINGLE-PHASE) 5.1.8.3 LIMITATION OF TOUCH CURRENT DUE TO RINGING SIGNALS 5.2.2 " ELECTRIC STRENGTH TEST" 5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST 5.3.1 - 5.3.9 " ABNORMAL OPERATION TESTS" 5.3.4, 5.2 ELECTRIC STRENGTH TEST (FOR SPACING DEFICIENT PWB) 5.3.7 " OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR" 6.1.2 REQUIREMENTS FOR SEPARATION BETWEEN TELECOMMUNICATION NETWORK FROM EARTH 6.2.2 (6.2.2.1) ELECTRIC STRENGTH TEST PROCEDURE (IMPULSE TEST) 6.2.2 (6.2.2.2) ELECTRIC STRENGTH TEST PROCEDURE (STEADY STATE TEST) 7.3, 6.2.2, 6.2.2.1 CABLE DISTRIBUTION SYSTEM, ELECTRIC STRENGTH TEST PROCEDURE, IMPULSE TEST 7.3, 6.2.2, 6.2.2.2 CABLE DISTRIBUTION SYSTEM, ELECTRIC STRENGTH TEST PROCEDURE, STEADY STATE TEST 7.4.2 CABLE DISTRIBUTION SYSTEMS, VOLTAGE SURGE TEST 7.4.3 CABLE DISTRIBUTION SYSTEMS, IMPULSE TEST ANNEX B.7 LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS
2014-06-18
IEC 62368-1:2014
4.4.4.2, ANNEX T.4 STEADY FORCE TEST, 100 N 4.4.4.2, ANNEX T.5 STEADY FORCE TEST, 250 N 4.4.4.2, ANNEX T.3 STEADY FORCE TEST, 30 N 4.4.4.3, ANNEX T.7 DROP TEST 4.4.4.4, ANNEX T.6 IMPACT TEST 4.4.4.5, ANNEX T.3 STEADY FORCE TEST FOR INTERNAL ENCLOSURE AND BARRIER 4.4.4.7, ANNEX T.8 STRESS RELIEF TEST 5.2, 5.7 CLASSIFICATION OF ELECTRICAL ENERGY SOURCES 5.4.1.3 TEST FOR HYGROSCOPIC MATERIALS 5.4.1.4, Annex B.2 MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS 6.3 NORMAL OPERATING CONDITIONS TEMPERATURE TEST 5.4.1.8 DETERMINATION OF WORKING VOLTAGE 5.4.1.10.3 BALL PRESSURE TEST 5.4.2.4 MINIMUM CLEARANCE BASED UPON ELECTRIC STRENGTH TEST 5.4.5, G.10.3.2 ANTENNA TERMINAL INSULATION – VOLTAGE SURGE 5.4.8 HUMIDITY CONDITIONING 5.4.9 ELECTRIC STRENGTH TEST 5.4.10, 5.4.10.2.2 SAFEGUARDS AGAINST TRANSIENT VOLTAGES FROM EXTERNAL CIRCUITS: IMPULSE TEST 5.4.10, 5.4.10.2.3 SAFEGUARDS AGAINST TRANSIENT VOLTAGES FROM EXTERNAL CIRCUITS: STEADY STATE TEST 5.4.11.3 TEST FOR SEPARATION BETWEEN EXTERNAL CIRCUITS AND EARTH 5.5.2.2 SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR 5.5.8 INSULATION BETWEEN THE MAINS AND AN EXTERNAL CIRCUIT CONSISTING OF A COAXIAL CABLE 5.6.6.2(a) RESISTANCE OF THE PROTECTIVE BONDING SYSTEM 5.7 PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT 5.7.5 PROTECTIVE CONDUCTOR CURRENT 5.7.7 SUMMATION OF TOUCH CURRENTS FROM EXTERNAL CIRCUITS 6.2.2.2, 6.2.2.3 POWER MEASUREMENTS 6.2.3.1 ARCING PIS DETERMINATION 6.2.3.2 RESISTIVE PIS DETERMINATION 6.3 NORMAL OPERATING CONDITIONS TEMPERATURE TEST 6.4.3, ANNEX B.4 REDUCTION OF THE LIKELIHOOD OF IGNITION UNDER SINGLE FAULT CONDITIONS 6.4.3.3 REDUCTION OF THE LIKELIHOOD OF IGNITION - TEMPERATURES LIMITED BY FUSES 6.6 TEST TO DETERMINE DELIVERED POWER: PS2 DETERMINATION 8.5.3, ANNEX T.8, ANNEX V ACCESSIBILITY TO MOVING PARTS 8.6.2 STATIC STABILITY 8.6.3 RELOCATION STABILITY TEST 8.6.5 HORIZONTAL FORCE TEST 8.7 WALL OR CEILING MOUNTING TESTS 8.8 HANDLE STRENGTH 8.9 WHEEL OR CASTER SECUREMENT 8.10.3 CART, STAND OR CARRIER LOADING 8.10.4 CART, STAND OR CARRIER IMPACT 8.10.5 CART, STAND OR CARRIER MECHANICAL STABILITY 8.10.6, ANNEX T.8 CART, STAND OR CARRIER THERMOPLASTIC TEMPERATURE STABILITY 8.11.3 RACK MOUNTED EQUIPMENT – MOUNTING MEANS: MECHANICAL STRENGTH TEST 8.11.4 RACK MOUNTED EQUIPMENT – MOUNTING MEANS: MECHANICAL STRENGTH TEST, 250 N, INCLUDING END STOPS B.2.5 INPUT TEST: SINGLE PHASE B.2.5 INPUT TEST: POLYPHASE B.2.6 NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENT B.3 SIMULATED ABNORMAL OPERATING CONDITIONS B.4 SIMULATED SINGLE FAULT CONDITIONS 6.4.2, ANNEX B.4 SINGLE FAULT CONDITIONS: REDUCE THE LIKELIHOOD OF IGNITION ANNEX F.3.10 TEST FOR THE PERMANENCE OF MARKINGS ANNEX G.5.4.6 LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORS ANNEX G.7.3.2 STRAIN RELIEF TEST ANNEX G.7.5 NON-DETACHABLE CORD BEND PROTECTION ANNEX G.7.6.2.2 STRANDED WIRE ANNEX H.2, 5.2.2.6 CRITERIA FOR TELEPHONE RINGING SIGNALS – METHOD A ANNEX H.3, 5.2.2.6 CRITERIA FOR TELEPHONE RINGING SIGNALS – METHOD B P.2.3.2 CONSEQUENCE OF ENTRY TEST ANNEX Q.1 LIMITED POWER SOURCE ANNEX Q.2, 6.5.3 TEST FOR EXTERNAL CIRCUITS – PAIRED CONDUCTOR CABLE ANNEX T.2 , 5.4.2.6, 5.4.3.2, G.15.3.6 STEADY FORCE TEST, 10 N ANNEX DVH FIELD-WIRING TEST ANNEX DVI OVERVOLTAGE TEST
2019-09-05