CTF

FSP Group Inc

 
  •  

Standards in Scope - WITHDRAWN

Category
Standard
Tests/Clauses
Acceptance Date
Responsible National Certification Body(s)
OFFIEC 60950-1:2005
1.2.2.1 - MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT‑AMPERE MEASUREMENT TEST 1.6.2 - INPUT TEST: SINGLE-PHASE 1.6.2 - INPUT TEST: POLYPHASE 1.7.11 - DURABILITY OF MARKING TEST 2.1.1.5, 2.1.2, 1.2.8.10 - ENERGY HAZARD MEASUREMENTS 2.1.1.7 - CAPACITANCE DISCHARGE TEST 2.2.2, 2.2.3, 2.2.4, PART 22 6.1 - SELV RELIABILITY TES 2.4.1, 2.4.2 - LIMITED CURRENT CIRCUIT MEASUREMENTS 2.5 - LIMITED POWER SOURCE MEASUREMENTS 2.6.3.4 - LIMITED SHORT-CIRCUIT TEST 2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I 2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II 2.6.4.1, 3.3.1 - ENGAGEMENT-DISENGAGEMENT TEST 2.7 - DC CIRCUIT FUSE TEST 2.9.1, 2.9.2, 5.2.2 - HUMIDITY TEST 2.10.2 - DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST 2.10.2 - DETERMINATION OF WORKING VOLTAGE - SECONDARY OUTPUT VOLTAGE TEST 2.10.5.8, ANNEX AA - MANDREL TEST FOR NON-SEPARABLE THIN SHEET MATERIAL 2.10.5.9, 2.10.5.10, 2.10.5.6 - THIN SHEET MATERIAL TESTS 2.10.5.13 - Transformer and Wire /Insulation Electric Strength 2.10.8, 2.10.9 - TESTS ON COATED PRINTED WIRING BOARDS AND COATED COMPONENTS (CONFORMAL COATINGS) 2.10.10, 2.10.9 - TEST FOR POLLUTION DEGREE 1 ENVIRONMENT AND FOR INSULATING COMPOUND 2.10.11, 2.10.9 - TESTS FOR SEMICONDUCTOR DEVICES AND FOR CEMENTED JOINTS 3.2.6, 4.2.1, 4.2.7 - STRAIN RELIEF TEST 4.1 - STABILITY TESTS 4.2.1 - 4.2.4 - STEADY FORCE TESTS 4.2.5, 4.2.1, PART 22 10.2 - IMPACT TEST 4.2.6, 4.2.1 - DROP TEST 4.2.7, 4.2.1 - STRESS RELIEF TEST 4.2.10 - LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT 4.2.11.1 - RACK MOUNTED EQUIPMENT - MECHANICAL STRENGTH TESTS 4.3.1 - SHARP EDGE TEST 4.3.2 - KNOB PULL/HANDLE LOADING TEST 4.3.5 - CONNECTOR CURRENT INTERRUPTION TEST 4.3.6 - DIRECT PLUG IN EQUIPMENT-MOMENT TEST 4.3.8 - BATTERY TESTS 4.3.8 - LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST 4.4.2, 4.4.4 - HAZARDOUS MOVING PARTS TEST 4.5.1, 1.4.12, 1.4.13 - HEATING TEST 4.5.5, 4.5 - BALL PRESSURE TEST 4.6.5 - BARRIER ADHESIVE TEST 5.1, ANNEX D - TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM) 5.1, ANNEX D - TOUCH CURRENT TEST (POLYPHASE; TN/TT SYSTEM) 5.1, ANNEX D - IT TOUCH CURRENT TEST (SINGLE-PHASE) 5.2.2 - ELECTRIC STRENGTH TEST 5.3.1, 5.3.4, 5.3.7 - COMPONENT FAILURE TEST 5.3.1, 5.3.9 - ABNORMAL OPERATION TESTS 5.3.3, 5.3.7b, ANNEX C.1 - TRANSFORMER ABNORMAL OPERATION TEST 5.3.7 - POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TEST 5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST ANNEX B, B.8 - INPUT TEST: SINGLE PHASE ANNEX B.4 - RUNNING OVERLOAD TEST ANNEX B.5, B.8 - LOCKED‐ROTOR OVERLOAD AND ENDURANCE TESTS ANNEX B.7 - LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS 4.4.4.2, (T.4), (T.5) - STEADY FORCE TEST 4.4.4.3, T.7 - DROP TEST 4.4.4.4, T.6 - IMPACT TEST 4.4.4.5, T.3 - STEADY FORCE TEST 4.4.4.7, T.8 - STRESS RELIEF TEST 5.2.2.2 - STEADY-STATE VOLTAGE AND CURRENT 5.4.1.4, 6.3.2, 9 - TEMPERATURE TESTS 5.4.1.8 - DETERMINATION OF WORKING VOLTAGE 5.4.1.10.3 - BALL PRESSURE TEST 5.4.2, 5.4.3 - CLEARANCE AND CREEPAGE DISTANCE MEASUREMENT 5.4.2.6, T.2 - STEADY FORCE TEST 5.4.8 - HUMIDITY CONDITIONING 5.4.9.1 - ELECTRIC STRENGTH 5.5.2.2 - STORED DISCHARGE ON CAPACITORS 5.5.8 - INSULATION BETWEEN THE MAINS AND AN EXTERNAL CIRCUIT CONSISTING OF A COAXIAL CABLE 6.2.2 - PS MEASUREMENTS FOR CLASSIFICATION 6.6 - PS2 DETERMINATION B.2.5 - INPUT CURRENT B.3, B.4 - ABNORMAL OPERATING AND FAULT CONDITIONS G.5.3.3 - TRANSFORMER OVERLOADED TEST Q.1 - LIMITED POWER SOURCE P.2.3.2 - CONSEQUENCE OF ENTRY TEST
2019-08-02
OFFIEC 60950-1:2005/AMD1:2009
1.2.2.1 - MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT‑AMPERE MEASUREMENT TEST 1.6.2 - INPUT TEST: SINGLE-PHASE 1.6.2 - INPUT TEST: POLYPHASE 1.7.11 - DURABILITY OF MARKING TEST 2.1.1.5, 2.1.2, 1.2.8.10 - ENERGY HAZARD MEASUREMENTS 2.1.1.7 - CAPACITANCE DISCHARGE TEST 2.2.2, 2.2.3, 2.2.4, PART 22 6.1 - SELV RELIABILITY TES 2.4.1, 2.4.2 - LIMITED CURRENT CIRCUIT MEASUREMENTS 2.5 - LIMITED POWER SOURCE MEASUREMENTS 2.6.3.4 - LIMITED SHORT-CIRCUIT TEST 2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I 2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II 2.6.4.1, 3.3.1 - ENGAGEMENT-DISENGAGEMENT TEST 2.7 - DC CIRCUIT FUSE TEST 2.9.1, 2.9.2, 5.2.2 - HUMIDITY TEST 2.10.2 - DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST 2.10.2 - DETERMINATION OF WORKING VOLTAGE - SECONDARY OUTPUT VOLTAGE TEST 2.10.5.8, ANNEX AA - MANDREL TEST FOR NON-SEPARABLE THIN SHEET MATERIAL 2.10.5.9, 2.10.5.10, 2.10.5.6 - THIN SHEET MATERIAL TESTS 2.10.5.13 - Transformer and Wire /Insulation Electric Strength 2.10.8, 2.10.9 - TESTS ON COATED PRINTED WIRING BOARDS AND COATED COMPONENTS (CONFORMAL COATINGS) 2.10.10, 2.10.9 - TEST FOR POLLUTION DEGREE 1 ENVIRONMENT AND FOR INSULATING COMPOUND 2.10.11, 2.10.9 - TESTS FOR SEMICONDUCTOR DEVICES AND FOR CEMENTED JOINTS 3.2.6, 4.2.1, 4.2.7 - STRAIN RELIEF TEST 4.1 - STABILITY TESTS 4.2.1 - 4.2.4 - STEADY FORCE TESTS 4.2.5, 4.2.1, PART 22 10.2 - IMPACT TEST 4.2.6, 4.2.1 - DROP TEST 4.2.7, 4.2.1 - STRESS RELIEF TEST 4.2.10 - LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT 4.2.11.1 - RACK MOUNTED EQUIPMENT - MECHANICAL STRENGTH TESTS 4.3.1 - SHARP EDGE TEST 4.3.2 - KNOB PULL/HANDLE LOADING TEST 4.3.5 - CONNECTOR CURRENT INTERRUPTION TEST 4.3.6 - DIRECT PLUG IN EQUIPMENT-MOMENT TEST 4.3.8 - BATTERY TESTS 4.3.8 - LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST 4.4.2, 4.4.4 - HAZARDOUS MOVING PARTS TEST 4.5.1, 1.4.12, 1.4.13 - HEATING TEST 4.5.5, 4.5 - BALL PRESSURE TEST 4.6.5 - BARRIER ADHESIVE TEST 5.1, ANNEX D - TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM) 5.1, ANNEX D - TOUCH CURRENT TEST (POLYPHASE; TN/TT SYSTEM) 5.1, ANNEX D - IT TOUCH CURRENT TEST (SINGLE-PHASE) 5.2.2 - ELECTRIC STRENGTH TEST 5.3.1, 5.3.4, 5.3.7 - COMPONENT FAILURE TEST 5.3.1, 5.3.9 - ABNORMAL OPERATION TESTS 5.3.3, 5.3.7b, ANNEX C.1 - TRANSFORMER ABNORMAL OPERATION TEST 5.3.7 - POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TEST 5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST ANNEX B, B.8 - INPUT TEST: SINGLE PHASE ANNEX B.4 - RUNNING OVERLOAD TEST ANNEX B.5, B.8 - LOCKED‐ROTOR OVERLOAD AND ENDURANCE TESTS ANNEX B.7 - LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS 4.4.4.2, (T.4), (T.5) - STEADY FORCE TEST 4.4.4.3, T.7 - DROP TEST 4.4.4.4, T.6 - IMPACT TEST 4.4.4.5, T.3 - STEADY FORCE TEST 4.4.4.7, T.8 - STRESS RELIEF TEST 5.2.2.2 - STEADY-STATE VOLTAGE AND CURRENT 5.4.1.4, 6.3.2, 9 - TEMPERATURE TESTS 5.4.1.8 - DETERMINATION OF WORKING VOLTAGE 5.4.1.10.3 - BALL PRESSURE TEST 5.4.2, 5.4.3 - CLEARANCE AND CREEPAGE DISTANCE MEASUREMENT 5.4.2.6, T.2 - STEADY FORCE TEST 5.4.8 - HUMIDITY CONDITIONING 5.4.9.1 - ELECTRIC STRENGTH 5.5.2.2 - STORED DISCHARGE ON CAPACITORS 5.5.8 - INSULATION BETWEEN THE MAINS AND AN EXTERNAL CIRCUIT CONSISTING OF A COAXIAL CABLE 6.2.2 - PS MEASUREMENTS FOR CLASSIFICATION 6.6 - PS2 DETERMINATION B.2.5 - INPUT CURRENT B.3, B.4 - ABNORMAL OPERATING AND FAULT CONDITIONS G.5.3.3 - TRANSFORMER OVERLOADED TEST Q.1 - LIMITED POWER SOURCE P.2.3.2 - CONSEQUENCE OF ENTRY TEST
2019-08-02
OFFIEC 60950-1:2005/AMD2:2013
1.2.2.1 - MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT‑AMPERE MEASUREMENT TEST 1.6.2 - INPUT TEST: SINGLE-PHASE 1.6.2 - INPUT TEST: POLYPHASE 1.7.11 - DURABILITY OF MARKING TEST 2.1.1.5, 2.1.2, 1.2.8.10 - ENERGY HAZARD MEASUREMENTS 2.1.1.7 - CAPACITANCE DISCHARGE TEST 2.2.2, 2.2.3, 2.2.4, PART 22 6.1 - SELV RELIABILITY TES 2.4.1, 2.4.2 - LIMITED CURRENT CIRCUIT MEASUREMENTS 2.5 - LIMITED POWER SOURCE MEASUREMENTS 2.6.3.4 - LIMITED SHORT-CIRCUIT TEST 2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST I 2.6.3.4, 2.6.1 - PROTECTIVE BONDING TEST II 2.6.4.1, 3.3.1 - ENGAGEMENT-DISENGAGEMENT TEST 2.7 - DC CIRCUIT FUSE TEST 2.9.1, 2.9.2, 5.2.2 - HUMIDITY TEST 2.10.2 - DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST 2.10.2 - DETERMINATION OF WORKING VOLTAGE - SECONDARY OUTPUT VOLTAGE TEST 2.10.5.8, ANNEX AA - MANDREL TEST FOR NON-SEPARABLE THIN SHEET MATERIAL 2.10.5.9, 2.10.5.10, 2.10.5.6 - THIN SHEET MATERIAL TESTS 2.10.5.13 - Transformer and Wire /Insulation Electric Strength 2.10.8, 2.10.9 - TESTS ON COATED PRINTED WIRING BOARDS AND COATED COMPONENTS (CONFORMAL COATINGS) 2.10.10, 2.10.9 - TEST FOR POLLUTION DEGREE 1 ENVIRONMENT AND FOR INSULATING COMPOUND 2.10.11, 2.10.9 - TESTS FOR SEMICONDUCTOR DEVICES AND FOR CEMENTED JOINTS 3.2.6, 4.2.1, 4.2.7 - STRAIN RELIEF TEST 4.1 - STABILITY TESTS 4.2.1 - 4.2.4 - STEADY FORCE TESTS 4.2.5, 4.2.1, PART 22 10.2 - IMPACT TEST 4.2.6, 4.2.1 - DROP TEST 4.2.7, 4.2.1 - STRESS RELIEF TEST 4.2.10 - LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT 4.2.11.1 - RACK MOUNTED EQUIPMENT - MECHANICAL STRENGTH TESTS 4.3.1 - SHARP EDGE TEST 4.3.2 - KNOB PULL/HANDLE LOADING TEST 4.3.5 - CONNECTOR CURRENT INTERRUPTION TEST 4.3.6 - DIRECT PLUG IN EQUIPMENT-MOMENT TEST 4.3.8 - BATTERY TESTS 4.3.8 - LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST 4.4.2, 4.4.4 - HAZARDOUS MOVING PARTS TEST 4.5.1, 1.4.12, 1.4.13 - HEATING TEST 4.5.5, 4.5 - BALL PRESSURE TEST 4.6.5 - BARRIER ADHESIVE TEST 5.1, ANNEX D - TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM) 5.1, ANNEX D - TOUCH CURRENT TEST (POLYPHASE; TN/TT SYSTEM) 5.1, ANNEX D - IT TOUCH CURRENT TEST (SINGLE-PHASE) 5.2.2 - ELECTRIC STRENGTH TEST 5.3.1, 5.3.4, 5.3.7 - COMPONENT FAILURE TEST 5.3.1, 5.3.9 - ABNORMAL OPERATION TESTS 5.3.3, 5.3.7b, ANNEX C.1 - TRANSFORMER ABNORMAL OPERATION TEST 5.3.7 - POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TEST 5.3.7 - OVERLOAD OF OPERATOR ACCESSIBLE CONNECTOR TEST ANNEX B, B.8 - INPUT TEST: SINGLE PHASE ANNEX B.4 - RUNNING OVERLOAD TEST ANNEX B.5, B.8 - LOCKED‐ROTOR OVERLOAD AND ENDURANCE TESTS ANNEX B.7 - LOCKED ROTOR OVERLOAD TEST FOR DC MOTORS IN SECONDARY CIRCUITS 4.4.4.2, (T.4), (T.5) - STEADY FORCE TEST 4.4.4.3, T.7 - DROP TEST 4.4.4.4, T.6 - IMPACT TEST 4.4.4.5, T.3 - STEADY FORCE TEST 4.4.4.7, T.8 - STRESS RELIEF TEST 5.2.2.2 - STEADY-STATE VOLTAGE AND CURRENT 5.4.1.4, 6.3.2, 9 - TEMPERATURE TESTS 5.4.1.8 - DETERMINATION OF WORKING VOLTAGE 5.4.1.10.3 - BALL PRESSURE TEST 5.4.2, 5.4.3 - CLEARANCE AND CREEPAGE DISTANCE MEASUREMENT 5.4.2.6, T.2 - STEADY FORCE TEST 5.4.8 - HUMIDITY CONDITIONING 5.4.9.1 - ELECTRIC STRENGTH 5.5.2.2 - STORED DISCHARGE ON CAPACITORS 5.5.8 - INSULATION BETWEEN THE MAINS AND AN EXTERNAL CIRCUIT CONSISTING OF A COAXIAL CABLE 6.2.2 - PS MEASUREMENTS FOR CLASSIFICATION 6.6 - PS2 DETERMINATION B.2.5 - INPUT CURRENT B.3, B.4 - ABNORMAL OPERATING AND FAULT CONDITIONS G.5.3.3 - TRANSFORMER OVERLOADED TEST Q.1 - LIMITED POWER SOURCE P.2.3.2 - CONSEQUENCE OF ENTRY TEST
2019-08-02
IEC 62368-1:2014
4.7 - EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: MOMENT TEST 4.7 - EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: BLADE SECUREMENT TEST 4.7 - EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: SECURITY OF INPUT CONTACTS 4.7 - EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: RESISTANCE TO CRUSHING 4.7 - EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: ROD PRESSURE TEST 4.7 - EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: INPUT BLADE ENDURANCE (RETRACTABLE BLADES) 5.2, 5.7 - CLASSIFICATION OF ELECTRICAL ENERGY SOURCES 5.4.1.4, Annex B.2 - MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS 5.4.1.5.2 - TEST FOR POLLUTION DEGREE 1 ENVIRONMENT AND FOR AN INSULATING COMPOUND 5.4.1.8 - DETERMINATION OF WORKING VOLTAGE 5.4.1.10.3 - BALL PRESSURE TEST 5.4.2.4 - MINIMUM CLEARANCE BASED UPON ELECTRIC STRENGTH TEST 5.4.4.6.2 - SEPARABLE THIN SHEET MATERIAL 5.4.8 - HUMIDITY CONDITIONING 5.4.9 - ELECTRIC STRENGTH TEST: 5.5.2.2 - SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR 5.5.8 - INSULATION BETWEEN THE MAINS AND AN EXTERNAL CIRCUIT CONSISTING OF A COAXIAL CABLE 5.6.6.2(a), 5.6.6.2(b), 5.6.6.4.2(c), 5.6.6.4.2(d), 5.6.6.2(e) - RESISTANCE OF THE PROTECTIVE BONDING SYSTEM 5.7 - PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT 5.7.5 - PROTECTIVE CONDUCTOR CURRENT 6.2.2.2, 6.2.2.3 - POWER MEASUREMENTS 6.2.3.1 - ARCING PIS DETERMINATION 6.2.3.2 - RESISTIVE PIS DETERMINATION 6.3 - NORMAL OPERATING CONDITIONS TEMPERATURE TEST 6.4.3, ANNEX B.4 - REDUCTION O OF THE LIKELIHOOD OF ANNEX F.3.10 - TEST FOR THE PERMANENCE OF MARKINGS ANNEX G.5.3.3 - TRANSFORMER OVERLOAD ANNEX G.5.3.3.3 - TRANSFORMER OVERLOAD – ALTERNATIVE TEST METHOD ANNEX G.5.4.6.3 - ALTERNATIVE LOCKED-ROTOR OVERLOAD TEST FOR D.C. MOTORS ANNEX G.7.3.2 - STRAIN RELIEF TEST ANNEX G.10.2 - RESISTOR TEST ANNEX G.13.6 - TESTS ON COATED PRINTED WIRING BOARDS AND COATED COMPONENTS (CONFORMAL COATINGS) ANNEX G.14 - COATINGS ON COMPONENT TERMINALS ANNEX G.16 - IC INCLUDING CAPACITOR DISCHARGE FUNCTION (ICX) ANNEX P.2.3.2 - CONSEQUENCE OF ENTRY TEST ANNEX Q.1 - LIMITED POWER SOURCE ANNEX T.2 (5.4.2.6, 5.4.3.2, G.15.3.6) - STEADY FORCE TEST, 10 N ANNEX T.3 (4.4.4.2, 4.4.4.5, 5.3.2.3, G.15.3.6, U.3) - STEADY FORCE TEST, 30 N ANNEX T.4 (4.4.4.2) - STEADY FORCE TEST, 100 N ANNEX T.4 (4.4.4.2) - STEADY FORCE TEST, 250 N ANNEX T.6 (4.4.4.4, 8.10.4) - ENCLOSURE IMPACT TEST ANNEX T.7 (4.4.4.3) - DROP TEST ANNEX T.8 (4.4.4.1, 4.4.4.7, 4.8.4.2, 8.6.1, 8.7.2, 8.10.6, G.7.3.2.4) - STRESS RELIEF TEST 4.4.4.2, ANNEX T.3 - STEADY FORCE TEST, 30 N 4.4.4.2, ANNEX T.4 - STEADY FORCE TEST, 100 N 4.4.4.2, ANNEX T.5 - STEADY FORCE TEST, 250 N 4.4.4.3, ANNEX T.7 - DROP TEST 4.4.4.4, ANNEX T.6 - IMPACT TEST 4.4.4.7, ANNEX T.8 - STRESS RELIEF TEST 4.7 - EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: MOMENT TEST 4.7 - EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: BLADE SECUREMENT TEST 4.7 - EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: SECURITY OF INPUT CONTACTS 4.7 - EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: RESISTANCE TO CRUSHING 4.7 - EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: ROD PRESSURE TEST 4.7 - EQUIPMENT FOR DIRECT INSERTION INTO MAINS SOCKET-OUTLETS: INPUT BLADE ENDURANCE (RETRACTABLE BLADES) 5.2, 5.7 - CLASSIFICATION OF ELECTRICAL ENERGY SOURCES 5.4.1.4, Annex B.2 - MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS 5.4.1.8 - DETERMINATION OF WORKING VOLTAGE 5.4.1.10.3 - BALL PRESSURE TEST 5.4.2.4 - MINIMUM CLEARANCE BASED UPON ELECTRIC STRENGTH TEST 5.4.4.6.2 - SEPARABLE THIN SHEET MATERIAL 5.4.8 - HUMIDITY CONDITIONING 5.4.9 - ELECTRIC STRENGTH TEST 5.5.2.2 - SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR 5.5.8 -
2019-08-02