Committee of Testing Laboratories![]() |
|---|
| CTL HOMEPAGE | ABOUT THE CTL | DECISION SHEETS | TESTING LABS |
| TESTING EQUIPMENT | PROFICIENCY TESTING | ETFs AND WORKING GROUPS | OPERATIONAL PROCEDURES |
Quick access to Product Categories |
| PRODUCT CATEGORY SAFE |
| IEC 60529(ed.2);am1 | IEC 61558-1(ed.1);am1 | IEC 61558-1(ed.2) | - |
| IEC60529 (ed.2);am1 | ||||
| Clause | Subject | Keywords | Sheet | |
| 17.1.1C | Dust test for IP 5X and 6X as described in the transformer standard |
- Transformers - Dust test - IEC 60529 |
592/06 | |
| IEC 61558-1(ed.1);am1 | ||||
| Clause | Subject | Keywords | Sheet | |
| 3.1.9.1, 3.1.11, 15.3, 15.5, 27.3 | Heat and fire protection |
- Non-inherently short circuit - Proof transformer - Fail-safe transformer |
589/06 | |
| 14.2 | Temperature of supports for transformers IP 00 |
- Temperature of supports - IP 00 - TRF |
590/06 | |
| 15.2 | Short circuit and overload protection |
- Transformers - Steady state conditions - Short circuit |
DSH 709 | |
| 15.3.2 | Short circuit and overload protection |
- Fuse current - Overloading Test - Overload current |
591/06 | |
| 17.1.1C | Dust test for IP 5X and 6X as described in the transformer standard |
- Transformers - Dust test - IEC 60529 |
592/06 | |
| 20.5 | Thermal cut-outs |
- PTC / resistor - Bi-metal contacts - IEC 60730 |
593/06 | |
| 26.2 | Creepage distances |
- Creepage distances - Reduced value - Imgregnation |
594/06 | |
| IEC 61558-1(ed.2) | ||||
| Clause | Subject | Keywords | Sheet | |
| Foreword | The use of the second edition of Part 1 in conjunction with the first edition of various sections of Parts 2 |
- Part 1 - Second Ed. - Parts 2 - TRF |
601/07 | |