Microsoft Corp

Address(es)
  • 17760 NE 67th Ct

    Redmond 98052
    WA
    United States of America

Website Not available
Status

MEMBER

Acceptance date 2015-05-29

Further information

Stage

Country

Name

3

United States of America

LEGEND: Scope Limitations
  • RA : Audio amplifiers with audio power > 0,5 Watts excluded
  • RC : Apparatus with connection(s) to a cable distribution system excluded
  • RSH : Shredders excluded
  • RT : Apparatus with connection(s) to a telecommunication network excluded
  • RV : CRT (cathode ray tubes)/ picture tubes, plasma/LCD or other video apparatus excluded
  • ROUT : Equipment intended for installation outdoors excluded
  • RWPT : Wireless power transmitter excluded

Category

Name

Tests/Clauses

Acceptance Date

Responsible National Certification Body

ITAV

4.4.3.2, ANNEX T.4 STEADY FORCE TEST, 100 N4.4.3.2, ANNEX T.5 STEADY FORCE TEST, 250 N4.4.3.2, ANNEX T.3 STEADY FORCE TEST, 30 N4.4.3.3, ANNEX T.7 DROP TEST4.4.3.4, ANNEX T.6, ANNEX Y.6.2 IMPACT TEST4.4.3.5, ANNEX T.3 STEADY FORCE TEST FOR INTERNAL ENCLOSURE AND BARRIER4.4.3.6, ANNEX T.9 GLASS IMPACT TEST4.4.3.8, ANNEX T.8 STRESS RELIEF TEST4.8.4.2, ANNEX T.8 EQUIPMENT CONTAINING COIN/BUTTON CELL BATTERIES: STRESS RELIEF TEST4.8.4.3 EQUIPMENT CONTAINING COIN/BUTTON CELL BATTERIES: BATTERY REPLACEMENT TEST4.8.4.4 EQUIPMENT CONTAINING COIN/BUTTON CELL BATTERIES: DROP TEST4.8.4.5 EQUIPMENT CONTAINING COIN/BUTTON CELL BATTERIES: IMPACT TEST4.8.4.6 EQUIPMENT CONTAINING COIN/BUTTON CELL BATTERIES: CRUSH TEST5.2.2.1-5.2.2.6 CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.2.2.7, 5.3.2.4 AUDIO OUTPUT VOLTAGE MEASUREMENT AND DETERMINATION OF ACCESSIBILITY TO PARTS OF TERMINALS USING STRIPPED WIRES5.4.1.8 DETERMINATION OF WORKING VOLTAGE5.4.9 ELECTRIC STRENGTH TEST5.4.10, 5.4.10.2.2 SAFEGUARDS AGAINST TRANSIENT VOLTAGES FROM EXTERNAL CIRCUITS: IMPULSE TEST5.4.10, 5.4.10.2.3 SAFEGUARDS AGAINST TRANSIENT VOLTAGES FROM EXTERNAL CIRCUITS: STEADY STATE TEST5.4.11.3 TEST FOR SEPARATION BETWEEN EXTERNAL CIRCUITS AND EARTH5.5.2.2 CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CONNECTOR 5.6.6.2 RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7.4 TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT – UNEARTHED ACCESSIBLE PARTS5.7.5 TOUCH CURRENT MEASUREMENT – EARTHED ACCESSIBLE CONDUCTIVE PARTS5.7.6 PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 POWER MEASUREMENTS6.2.3.1 ARCING PIS DETERMINATION6.2.3.2 RESISTIVE PIS DETERMINATION6.4.8.3.3, ANNEX S.2 TOP OPENINGS AND TOP OPENING PROPERTIES8.5.4.3.4 ELECTROMECHANICAL EQUIPMENT – DESTRUCTION OF MEDIA8.6.2 STATIC STABILITY8.6.3 RELOCATION STABILITY TEST8.6.4 GLASS SLIDE TEST8.6.5 HORIZONTAL FORCE TEST8.7 WALL, CEILING, OR OTHER STRUCTURE MOUNTING TESTS8.8 HANDLE STRENGTH8.9 WHEEL OR CASTER SECUREMENT8.10.3 CART, STAND OR CARRIER LOADING8.11.3.1 RACK MOUNTED EQUIPMENT – MOUNTING MEANS: DOWNWARD FORCE TEST8.11.3.2, 8.11.3.3 RACK MOUNTED EQUIPMENT – MOUNTING MEANS: LATERAL PUSH FORCE AND END STOPS TESTSB.2.5 INPUT TEST: SINGLE PHASEB.2.5 INPUT TEST: PRODUCTS CONTAINING AN AUDIO AMPLIFIERB.2.5 INPUT TEST: TELEVISION RECEIVERS/MONITORSB.1.5, B.2.6, 5.4.1.4, 6.3, 9.3 NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTB.3 SIMULATED ABNORMAL OPERATING CONDITIONSB.4 SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10 TEST FOR THE PERMANENCE OF MARKINGSM.4.2 SECONDARY LITHIUM BATTERY CHARGING SAFEGUARDSM.4.4, T.7 DROP TEST OF EQUIPMENT CONTAINING A SECONDARY LITHIUM BATTERYP.2.3.2 CONSEQUENCE OF ENTRY TESTANNEX P.4.2 METALLIZED COATINGS AND ADHESIVES SECURING PARTSANNEX T.2, 5.4.2.6, 5.4.3.2, G.15.2.6 STEADY FORCE TEST, 10 NQ.1 LIMITED POWER SOURCE
2021-05-17

ITAV

4.8.4.2, ANNEX T.8 PRODUCTS CONTAINING LITHIUM COIN/BUTTON CELL BATTERIES: STRESS RELIEF TEST4.8.4.3 PRODUCTS CONTAINING LITHIUM COIN/BUTTON CELL BATTERIES: BATTERY REPLACEMENT TEST4.8.4.4 PRODUCTS CONTAINING LITHIUM COIN/BUTTON CELL BATTERIES: DROP TEST4.8.4.5 PRODUCTS CONTAINING LITHIUM COIN/BUTTON CELL BATTERIES: IMPACT TEST4.8.4.6 PRODUCTS CONTAINING LITHIUM COIN/BUTTON CELL BATTERIES: CRUSH TEST5.2, 5.7 CLASSIFICATION OF ELECTRICAL ENERGY SOURCES5.4.1.4, ANNEX B.2 MAXIMUM OPERATING TEMPERATURE FOR MATERIALS, COMPONENTS AND SYSTEMS5.4.1.8 DETERMINATION OF WORKING VOLTAGE5.4.10 SAFEGUARDS AGAINST TRANSIENT VOLTAGES FROM EXTERNAL CIRCUITS5.4.11 TEST FOR SEPARATION BETWEEN EXTERNAL CIRCUITS AND EARTH5.4.8 HUMIDITY CONDITIONING5.4.9 ELECTRIC STRENGTH5.5.2.2 SAFEGUARDS AGAINST CAPACITOR DISCHARGE AFTER DISCONNECTION OF A CAPACITOR5.6.6 RESISTANCE OF THE PROTECTIVE BONDING SYSTEM5.7 PROSPECTIVE TOUCH VOLTAGE AND TOUCH CURRENT MEASUREMENT5.7.5 PROTECTIVE CONDUCTOR CURRENT6.2.2.2, 6.2.2.3 POWER MEASUREMENTS6.2.3.1 ARCING PIS DETERMINATION6.2.3.2 RESISTIVE PIS DETERMINATION6.4.8.3.3, ANNEX S.2 TOP OPENINGS AND TOP OPENING PROPERTIES8.10.3 CART, STAND OR CARRIER LOADING8.11.3 RACK MOUNTED EQUIPMENT – MOUNTING MEANS: MECHANICAL STRENGTH TEST8.11.4 RACK MOUNTED EQUIPMENT – MOUNTING MEANS: MECHANICAL STRENGTH TEST, 250 N, INCLUDING END STOPS8.5.4.2.4 ELECTROMECHANICAL EQUIPMENT – DESTRUCTION OF MEDIA8.6.2 STATIC STABILITY8.6.3 RELOCATION STABILITY TEST8.6.4 GLASS SLIDE TEST8.6.5 HORIZONTAL FORCE TEST8.7 WALL OR CEILING MOUNTING TESTS8.8 HANDLE STRENGTH8.9 WHEEL OR CASTER SECUREMENTANNEX B.2.5 INPUT TEST: PRODUCTS CONTAINING AN AUDIO AMPLIFIERANNEX B.2.5 INPUT TEST: SINGLE PHASEANNEX B.2.5 INPUT TEST: TELEVISION RECEIVERS/MONITORSANNEX B.2.6 NORMAL OPERATING CONDITIONS TEMPERATURE MEASUREMENTANNEX B.3 SIMULATED ABNORMAL OPERATING CONDITIONSANNEX B.4 SIMULATED SINGLE FAULT CONDITIONSANNEX F.3.10 TEST FOR THE PERMANENCE OF MARKINGSANNEX M.4.2 SECONDARY LITHIUM BATTERY CHARGING SAFEGUARDSM.4.4, T.7 DROP TEST OF EQUIPMENT CONTAINING A SECONDARY LITHIUM BATTERYANNEX M.6.2 LEAKAGE CURRENTS FROM BATTERY CIRCUITSANNEX P.2.3.2 CONSEQUENCE OF ENTRY TESTANNEX P.4.2 METALLIZED COATINGS AND ADHESIVES SECURING PARTSANNEX T.11 (8.12) TEST FOR TELESCOPING OR ROD ANTENNASANNEX T.2 - T.5 STEADY FORCE TEST (10N, 30N, 100N, 250N)ANNEX T.6 ENCLOSURE IMPACT TESTANNEX T.7 DROP TESTANNEX T.8 STRESS RELIEF TESTANNEX T.9 (GLASS) IMPACT TESTAnnex Q.1 LIMITED POWER SOURCE
2015-05-29

ITAV

5.1 POWER TRANSFER USING ES1 OR ES2 VOLTAGES, GENERAL REQUIREMENTS5.3.2 DC power transfer interconnection to other equipment5.4.1 Requirement for the PSE5.4.2 Requirement for the PD
2022-05-05

OFF

1.6.2 INPUT: SINGLE-PHASE1.7.11 DURABILITY2.1.1.1, 2.8.2 ACCESS TO ENERGIZED PARTS2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.1.1.9 AUDIO AMPLIFIER TOUCH CURRENT2.10.2 DETERMINATION OF WORKING VOLTAGE; VOLTAGE MEASUREMENT2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I2.9.1, 2.9.2, 5.2.2 HUMIDITY3.1.9 CONDUCTOR TERMINATIONS - STEADY FORCE TEST3.2.6, 4.2.1, 4.2.7 STRAIN RELIEF3.2.8 CORD GUARD4.1 STABILITY TESTS4.2.10 LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.2.1-4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1 IMPACT4.2.6, 4.2.1 DROP TEST4.2.7, 4.2.1 STRESS RELIEF TEST4.3.2 KNOB PULL/HANDLE LOADING4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.4.2, 4.4.4 HAZARDOUS MOVING PARTS4.5.1, 1.4.12, 1.4.13 HEATING TEST5.1, ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1 - 5.3.9 ABNORMAL OPERATION TESTS5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTORANNEX DD RACK MOUNTED EQUIPMENT - MECHANICAL STRENGTH
2015-05-29

OFF

1.6.2 INPUT: SINGLE-PHASE1.7.11 DURABILITY2.1.1.1, 2.8.2 ACCESS TO ENERGIZED PARTS2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.1.1.9 AUDIO AMPLIFIER TOUCH CURRENT2.10.2 DETERMINATION OF WORKING VOLTAGE; VOLTAGE MEASUREMENT2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I2.9.1, 2.9.2, 5.2.2 HUMIDITY3.1.9 CONDUCTOR TERMINATIONS - STEADY FORCE TEST3.2.6, 4.2.1, 4.2.7 STRAIN RELIEF3.2.8 CORD GUARD4.1 STABILITY TESTS4.2.10 LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.2.1-4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1 IMPACT4.2.6, 4.2.1 DROP TEST4.2.7, 4.2.1 STRESS RELIEF TEST4.3.2 KNOB PULL/HANDLE LOADING4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.4.2, 4.4.4 HAZARDOUS MOVING PARTS4.5.1, 1.4.12, 1.4.13 HEATING TEST5.1, ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1 - 5.3.9 ABNORMAL OPERATION TESTS5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTORANNEX DD RACK MOUNTED EQUIPMENT - MECHANICAL STRENGTH
2015-05-29

OFF

1.6.2 INPUT: SINGLE-PHASE1.7.11 DURABILITY2.1.1.1, 2.8.2 ACCESS TO ENERGIZED PARTS2.1.1.5, 2.1.2, 1.2.8.10 ENERGY HAZARD MEASUREMENTS2.1.1.7 CAPACITANCE DISCHARGE TEST2.1.1.9 AUDIO AMPLIFIER TOUCH CURRENT2.10.2 DETERMINATION OF WORKING VOLTAGE; VOLTAGE MEASUREMENT2.4.1, 2.4.2 LIMITED CURRENT CIRCUIT MEASUREMENTS2.5 LIMITED POWER SOURCE MEASUREMENTS2.6.3.4, 2.6.1 PROTECTIVE BONDING TEST I2.9.1, 2.9.2, 5.2.2 HUMIDITY3.1.9 CONDUCTOR TERMINATIONS - STEADY FORCE TEST3.2.6, 4.2.1, 4.2.7 STRAIN RELIEF3.2.8 CORD GUARD4.1 STABILITY TESTS4.2.10 LOADING TESTS – WALL AND CEILING MOUNTED EQUIPMENT4.2.1-4.2.4 STEADY FORCE TESTS4.2.5, 4.2.1 IMPACT4.2.6, 4.2.1 DROP TEST4.2.7, 4.2.1 STRESS RELIEF TEST4.3.2 KNOB PULL/HANDLE LOADING4.3.8 LITHIUM BATTERY REVERSE CURRENT MEASUREMENT TEST4.4.2, 4.4.4 HAZARDOUS MOVING PARTS4.5.1, 1.4.12, 1.4.13 HEATING TEST5.1, ANNEX D TOUCH CURRENT TEST (SINGLE-PHASE; TN/TT SYSTEM)5.2.2 ELECTRIC STRENGTH TEST5.3.1 - 5.3.9 ABNORMAL OPERATION TESTS5.3.1, 5.3.4, 5.3.7 COMPONENT FAILURE TEST5.3.7 OVERLOAD OF OPERATOR ACCESSIBLE CONNECTORANNEX DD RACK MOUNTED EQUIPMENT - MECHANICAL STRENGTH
2015-05-29

TRON

10.2 HUMIDITY TREATMENT10.3 INSULATION RESISTANCE AND DIELECTRIC STRENGTH AFTER HUMIDITY TREATMENT12.1.3 IMPACT 12.1.3 DIELECTRIC STRENGTH AFTER IMPACT TEST12.1.4 DROP TEST12.1.4 DIELECTRIC STRENGTH AFTER DROP TEST12.1.5 STRESS RELIEF TEST12.2 FIXING OF ACTUATING ELEMENTS12.4 DRAWER MECHANICAL STRENGTH15.2 PROTECTIVE EARTH TERMINAL RESISTANCE TEST16.5 MAINS FLEXIBLE CORD STRAIN AND TORQUE TEST16.5 MAINS FLEXIBLE CORD STRAIN AND TORQUE TEST FOLLOWING STRESS RELIEF CONDITIONING17.1 SCREW SECUREMENT TEST17.7 COVER-FIXING DEVICES TEST 19.1 TEST AT 10° TO THE HORIZONTAL19.2 VERTICAL FORCE TEST19.3 HORIZONTAL FORCE TEST19.6 WALL OR CEILING OR EQUIPMENT RACK MOUNTING TEST19.6 WALL OR CEILING OR EQUIPMENT RACK MOUNTING TEST FOLLOWING STRESS RELIEF CONDITIONING4.2 INPUT TEST FOR APPARATUS EMPLOYING SIGNAL INPUTS AND NOT CONTAINING AN AUDIO AMPLIFIER4.3.1, 4.3.2, 4.3.4 FAULT CONDITIONS: CLEARANCE AND CREEPAGE, INSULATING MATERIALS AND ELECTRONIC COMPONENTS4.3.10 FAULT CONDITIONS: VENTILATION OPENINGS BLOCKED4.3.6 FAULT CONDITIONS, FAN FAILURE/STALLED ROTOR4.3.9 FAULT CONDITIONS, OUTPUT TERMINAL OVERLOAD5 MARKING DURABILITY AND LEGIBILITY7 HEATING UNDER NORMAL OPERATING CONDITIONS8.13 WINDOWS, LENSES EXTERNAL FORCE TEST8.14 COVERS, EXTERNAL FORCE TEST8.3 HUMIDITY TREATMENT OF HYGROSCOPIC INSULATING MATERIALS9.1.1 TOUCH CURRENT9.1.6 WITHDRAWAL OF MAINS PLUG9.1.7 ENCLOSURE RESISTANCE TO EXTERNAL FORCES TEST
2017-05-03

TRON

10.2 HUMIDITY TREATMENT10.3 INSULATION RESISTANCE AND DIELECTRIC STRENGTH AFTER HUMIDITY TREATMENT12.1.3 IMPACT 12.1.3 DIELECTRIC STRENGTH AFTER IMPACT TEST12.1.4 DROP TEST12.1.4 DIELECTRIC STRENGTH AFTER DROP TEST12.1.5 STRESS RELIEF TEST12.2 FIXING OF ACTUATING ELEMENTS12.4 DRAWER MECHANICAL STRENGTH15.2 PROTECTIVE EARTH TERMINAL RESISTANCE TEST16.5 MAINS FLEXIBLE CORD STRAIN AND TORQUE TEST16.5 MAINS FLEXIBLE CORD STRAIN AND TORQUE TEST FOLLOWING STRESS RELIEF CONDITIONING17.1 SCREW SECUREMENT TEST17.7 COVER-FIXING DEVICES TEST 19.1 TEST AT 10° TO THE HORIZONTAL19.2 VERTICAL FORCE TEST19.3 HORIZONTAL FORCE TEST19.6 WALL OR CEILING OR EQUIPMENT RACK MOUNTING TEST19.6 WALL OR CEILING OR EQUIPMENT RACK MOUNTING TEST FOLLOWING STRESS RELIEF CONDITIONING4.2 INPUT TEST FOR APPARATUS EMPLOYING SIGNAL INPUTS AND NOT CONTAINING AN AUDIO AMPLIFIER4.3.1, 4.3.2, 4.3.4 FAULT CONDITIONS: CLEARANCE AND CREEPAGE, INSULATING MATERIALS AND ELECTRONIC COMPONENTS4.3.10 FAULT CONDITIONS: VENTILATION OPENINGS BLOCKED4.3.6 FAULT CONDITIONS, FAN FAILURE/STALLED ROTOR4.3.9 FAULT CONDITIONS, OUTPUT TERMINAL OVERLOAD5 MARKING DURABILITY AND LEGIBILITY7 HEATING UNDER NORMAL OPERATING CONDITIONS8.13 WINDOWS, LENSES EXTERNAL FORCE TEST8.14 COVERS, EXTERNAL FORCE TEST8.3 HUMIDITY TREATMENT OF HYGROSCOPIC INSULATING MATERIALS9.1.1 TOUCH CURRENT9.1.6 WITHDRAWAL OF MAINS PLUG9.1.7 ENCLOSURE RESISTANCE TO EXTERNAL FORCES TEST
2017-05-03

TRON

10.2 HUMIDITY TREATMENT10.3 INSULATION RESISTANCE AND DIELECTRIC STRENGTH AFTER HUMIDITY TREATMENT12.1.3 IMPACT 12.1.3 DIELECTRIC STRENGTH AFTER IMPACT TEST12.1.4 DROP TEST12.1.4 DIELECTRIC STRENGTH AFTER DROP TEST12.1.5 STRESS RELIEF TEST12.2 FIXING OF ACTUATING ELEMENTS12.4 DRAWER MECHANICAL STRENGTH15.2 PROTECTIVE EARTH TERMINAL RESISTANCE TEST16.5 MAINS FLEXIBLE CORD STRAIN AND TORQUE TEST16.5 MAINS FLEXIBLE CORD STRAIN AND TORQUE TEST FOLLOWING STRESS RELIEF CONDITIONING17.1 SCREW SECUREMENT TEST17.7 COVER-FIXING DEVICES TEST 19.1 TEST AT 10° TO THE HORIZONTAL19.2 VERTICAL FORCE TEST19.3 HORIZONTAL FORCE TEST19.6 WALL OR CEILING OR EQUIPMENT RACK MOUNTING TEST19.6 WALL OR CEILING OR EQUIPMENT RACK MOUNTING TEST FOLLOWING STRESS RELIEF CONDITIONING4.2 INPUT TEST FOR APPARATUS EMPLOYING SIGNAL INPUTS AND NOT CONTAINING AN AUDIO AMPLIFIER4.3.1, 4.3.2, 4.3.4 FAULT CONDITIONS: CLEARANCE AND CREEPAGE, INSULATING MATERIALS AND ELECTRONIC COMPONENTS4.3.10 FAULT CONDITIONS: VENTILATION OPENINGS BLOCKED4.3.6 FAULT CONDITIONS, FAN FAILURE/STALLED ROTOR4.3.9 FAULT CONDITIONS, OUTPUT TERMINAL OVERLOAD5 MARKING DURABILITY AND LEGIBILITY7 HEATING UNDER NORMAL OPERATING CONDITIONS8.13 WINDOWS, LENSES EXTERNAL FORCE TEST8.14 COVERS, EXTERNAL FORCE TEST8.3 HUMIDITY TREATMENT OF HYGROSCOPIC INSULATING MATERIALS9.1.1 TOUCH CURRENT9.1.6 WITHDRAWAL OF MAINS PLUG9.1.7 ENCLOSURE RESISTANCE TO EXTERNAL FORCES TEST
2017-05-03